Evaluation of the environmental sustainability of different waste-to-energy plant configurations

被引:26
|
作者
Lombardi, Lidia [1 ]
Carnevale, Ennio A. [2 ]
机构
[1] Niccola Cusano Univ, Via Don Carlo Gnocchi 3, I-00166 Rome, Italy
[2] Univ Florence, Ind Engn Dept, Via Santa Marta 3, I-50127 Florence, Italy
关键词
Electric efficiency; Cogeneration; R1; Life cycle assessment; Plant size; Municipal solid waste; LIFE-CYCLE ASSESSMENT; TECHNOLOGIES; PERFORMANCES; METHODOLOGY; RECOVERY; SYSTEMS;
D O I
10.1016/j.wasman.2017.07.006
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Residual municipal solid waste (MSW) has an average lower heating value higher than 10 GJ/Mg in the EU, and can be recovered in modern Waste-to-Energy (WtE) plants, producing combined heat and power (CHP) and reaching high levels of energy recovery. CHP is pinpointed as the best technique for energy recovery from waste. However, in some cases, heat recovery is not technically feasible - due to the absence of a thermal user (industrial plant or district heating) in the vicinity of the WtE plant - and power production remains the sole possibility. In these cases, there are some challenges involved in increasing the energy performance as much as possible. High energy recovery efficiency values are very important for the environmental sustainability of WtE plants. The more electricity and heat is produced, the better the saving of natural resources that can be achieved. Within this frame, the aim of this work is to carry out an environmental assessment, through Life Cycle Assessment, of an MSW WtE plant, considering different sizes and operated in different ways, from power production only to full cogeneration. The main assumption is that the electric conversion efficiency increases as the plant size increases, introducing technical improvements thanks to the economies of scale. Impact assessment results were calculated using ReCiPe 2008 methods. The climate change indicator is positive when the WtE plant is operated in power production only mode, with values decreasing for the increasing size. Values for the climate change are negative when cogeneration is applied, requiring increasing cogeneration ratios for decreasing size. Similarly, the fossil fuel depletion indicator benefits from increase of both the plant size and the cogeneration rate, but it is always negative, meaning that the residual MSW burning with energy recovery always provides a saving of fossil primary energy. Other indicator values are in general negative and are also beneficially affected by increasing the plant size, but they worsen when increasing the cogeneration rate. The remaining indicators - i.e. human toxicity and terrestrial ecotoxicity-always have positive values, which decrease for increasing plant size and increase as the cogeneration rate increases. However, the local context should be evaluated carefully with reference to the type of electricity which is substituted and in view of a future massive production of renewable electricity, because conclusions change accordingly. Finally, it was evaluated that the inclusion of bottom ash recovery - instead of landfilling - can significantly improve the values of several impact assessment indicators. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:232 / 246
页数:15
相关论文
共 50 条
  • [1] WASTE-TO-ENERGY - WASTE-TO-ENERGY PLANT EXPANDS
    HODSON, CO
    POLLUTION ENGINEERING, 1995, 27 (12) : 14 - 14
  • [2] Different numerical approaches for the analysis of a waste-to-energy plant
    Canale, Christian
    Arpino, Fausto
    Cortellessa, Gino
    Grossi, Giorgio
    APPLIED THERMAL ENGINEERING, 2025, 266
  • [3] Environmental impact and economic sustainability analysis of a novel anaerobic digestion waste-to-energy pilot plant in Pakistan
    Rizwan Rasheed
    Abdullah Yasar
    Yubo Wang
    Amtul Bari Tabinda
    Sajid Rashid Ahmad
    Fizza Tahir
    Yuehong Su
    Environmental Science and Pollution Research, 2019, 26 : 26404 - 26417
  • [4] Environmental impact and economic sustainability analysis of a novel anaerobic digestion waste-to-energy pilot plant in Pakistan
    Rasheed, Rizwan
    Yasar, Abdullah
    Wang, Yubo
    Tabinda, Amtul Bari
    Ahmad, Sajid Rashid
    Tahir, Fizza
    Su, Yuehong
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2019, 26 (25) : 26404 - 26417
  • [5] Reaching Sustainability Goals with Waste-to-Energy
    Gilbert, Dominique
    Grubisich, Sarah
    Cosper, Stephen
    Military Engineer, 2024, 116 (749): : 59 - 60
  • [6] Toward sustainability of Waste-to-Energy: An overview
    Hsu, Hsin-Wei
    Binyet, Emmanuel
    Nugroho, Rusdan Aditya Aji
    Wang, Wei-Cheng
    Srinophakun, Penjit
    Chein, Rei-Yu
    Demafelis, Rex
    Chiarasumran, Nutchapon
    Saputro, Herman
    Alhikami, Akhmad Faruq
    Sakulshah, Netipon
    Laemthong, Tunyaboon
    ENERGY CONVERSION AND MANAGEMENT, 2024, 321
  • [7] Spatial targeting evaluation of energy and environmental performance of waste-to-energy processing
    Petar S. Varbanov
    Timothy G. Walmsley
    Yee V. Fan
    Jiří J. Klemeš
    Simon J. Perry
    Frontiers of Chemical Science and Engineering, 2018, 12 : 731 - 744
  • [8] Spatial targeting evaluation of energy and environmental performance of waste-to-energy processing
    Varbanov, Petar S.
    Walmsley, Timothy G.
    Fan, Yee V.
    Klemes, Jiri J.
    Perry, Simon J.
    FRONTIERS OF CHEMICAL SCIENCE AND ENGINEERING, 2018, 12 (04) : 731 - 744
  • [9] A WASTE-TO-ENERGY RECYCLING PLANT FOR BEIRUT
    WILSON, DG
    SABA, EF
    NUWAYHID, RY
    HAMRIN, D
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART A-JOURNAL OF POWER AND ENERGY, 1995, 209 (A1) : 63 - 70
  • [10] Cost Analysis of Waste-to-Energy Plant
    Schneider, Daniel Rolph
    Loncar, Drazen
    Bogdan, Zeljko
    STROJARSTVO, 2010, 52 (03): : 369 - 378