Toward successful agile requirements change management process in global software development: a client-vendor analysis

被引:21
|
作者
Kamal, Tahir [1 ]
Zhang, Qinghua [1 ]
Akbar, Muhammad Azeem [2 ]
机构
[1] Chongqing Univ Posts & Telecommun, Sch Comp Sci & Technol, Chongqing, Peoples R China
[2] Chongqing Univ, Sch Big Data & Software Engn, Chongqing, Peoples R China
基金
中国国家自然科学基金;
关键词
software engineering; management of change; organisational aspects; project management; human resource management; software development management; client-vendor-based analysis; considered factors; positive correlation; investigated factors; project management book; GSD firms; ARCM activities; toward successful agile requirements; management process; global software development; client-vendor analysis; requirements change management; important phase; complicated phase; software development process; agile RCM process; questionnaire survey; practitioner participants; 56 survey respondents; COMMUNICATION RISKS; QUALITY;
D O I
10.1049/iet-sen.2019.0128
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
Requirements change management (RCM) is an important and complicated phase in the agile for the software development process. The objective of this study was to identify and analyse the factors that can positively affect the agile RCM (ARCM) process in the context of global software development (GSD). To this end, a questionnaire survey was carried out with researcher and practitioner participants working in the field of GSD. From the 56 survey respondents, a total of 20 factors that can positively influence the ARCM activities in GSD were identified. The authors also performed a client-vendor-based analysis to investigate the significance of the considered factors for different organisation types. Additionally, they compared the data collected from researchers and practitioners. The comparison results (r(s)(20) = 0.076) revealed that there exists a positive correlation between the rankings in each data set. The investigated factors were mapped to ten project management book of knowledge areas, and the mapping results revealed that human resource management is the most significant knowledge area amongst the investigated factors. The findings of this study provide a robust framework to assist GSD firms in implementing ARCM activities.
引用
收藏
页码:265 / 274
页数:10
相关论文
共 50 条
  • [1] Towards the Guidelines for Requirements Change Management in Global Software Development: Client-Vendor Perspective
    Akbar, Muhammad Azeem
    Sang, Jun
    Nasrullah
    Khan, Arif Ali
    Shafiq, Muhammad
    Fazal-E-Amin
    [J]. IEEE ACCESS, 2019, 7 : 76985 - 77007
  • [2] Challenges of project management in global software development: A client-vendor analysis
    Niazi, Mahmood
    Mahmood, Sajjad
    Alshayeb, Mohammad
    Riaz, Mohammed Rehan
    Faisal, Kanaan
    Cerpa, Narciso
    Khan, Siffat Ullah
    Richardson, Ita
    [J]. INFORMATION AND SOFTWARE TECHNOLOGY, 2016, 80 : 1 - 19
  • [3] A multivocal study to improve the implementation of global requirements change management process: A client-vendor prospective
    Akbar, Muhammad Azeem
    Mahmood, Sajjad
    Alsanad, Ahmed
    Alsanad, Abeer Abdul-Aziz
    Gumaei, Abdu
    Qadri, Syed Furqan
    [J]. JOURNAL OF SOFTWARE-EVOLUTION AND PROCESS, 2020, 32 (08)
  • [4] Systematic Review of Success Factors for Scaling Agile Methods in Global Software Development Environment: A Client-Vendor Perspective
    Shameem, Mohammad
    Kumar, Chiranjeev
    Chandra, Bibhas
    Khan, Arif Ali
    [J]. 2017 24TH ASIA-PACIFIC SOFTWARE ENGINEERING CONFERENCE WORKSHOPS (APSECW), 2017, : 17 - 24
  • [5] Systematic literature review and empirical investigation of barriers to process improvement in global software development: Client-vendor perspective
    Khan, Arif Ali
    Keung, Jacky
    Niazi, Mahmood
    Hussain, Shahid
    Ahmad, Awais
    [J]. INFORMATION AND SOFTWARE TECHNOLOGY, 2017, 87 : 180 - 205
  • [6] Systematic literature study for dimensional classification of success factors affecting process improvement in global software development: client-vendor perspective
    Khan, Arif Ali
    Keung, Jacky
    Hussain, Shahid
    Niazi, Mahmood
    Kieffer, Suzanne
    [J]. IET SOFTWARE, 2018, 12 (04) : 333 - 344
  • [7] Vendor and Client Interaction for Requirements Assessment in Software Development: Implications for Feedback Process
    Jayanth, Rajiv
    Jacob, Varghese S.
    Radhakrishnan, Suresh
    [J]. INFORMATION SYSTEMS RESEARCH, 2011, 22 (02) : 289 - 305
  • [8] Assessing the Determinants of Adopting Component-Based Development in a Global Context: A Client-Vendor Analysis
    Khan, Muhammad Jalal
    Mahmood, Sajjad
    [J]. IEEE ACCESS, 2018, 6 : 79060 - 79073
  • [9] Effect of Project Management in Requirements Engineering and Requirements Change Management Process for Global Software Development
    Shafiq, Muhammad
    Zhang, Qinghua
    Akbar, Muhammad Azeem
    Khan, Arif Ali
    Hussain, Shahid
    Fazal-E-Amin
    Khan, Asfandyar
    Soofi, Aized Amin
    [J]. IEEE ACCESS, 2018, 6 : 25747 - 25763
  • [10] Effects of knowledge management on client-vendor relationship quality: the mediating role of global mindset
    Sharma, Revti Raman
    Chadee, Doren
    Roxas, Banjo
    [J]. JOURNAL OF KNOWLEDGE MANAGEMENT, 2016, 20 (06) : 1268 - 1281