A Promising Radar Altimetry Satellite System for Operational Flood Forecasting in Flood-Prone Bangladesh

被引:26
|
作者
Hossain, Faisal [1 ]
Maswood, Mehedi [1 ]
Siddique-E-Akbor, A. H. [2 ]
Yigzaw, Wondmagegn [2 ]
Mazumder, Liton Chandra [3 ]
Ahmed, Tanvir [3 ]
Hossain, Monowar [3 ]
Shah-Newaz, S. M. [3 ]
Limaye, Ashutosh [4 ]
Lee, Hyongki [5 ]
Pradhan, Sudip [6 ]
Shrestha, Basanta [6 ]
Bajracahrya, Birendra [6 ]
Biancamaria, Sylvain [7 ]
Shum, C. K. [8 ]
Turk, F. J. [9 ]
机构
[1] Univ Washington, Dept Civil & Environm Engn, Seattle, WA 98195 USA
[2] Tennessee Technol Univ, Cookeville, TN 38505 USA
[3] Inst Water Modeling, Dhaka, Bangladesh
[4] NASA Marshall Space Flight Ctr, Huntsville, AL USA
[5] Univ Houston, Dept Civil & Environm Engn, Houston, TX 77204 USA
[6] Int Ctr Integrated Mt Dev ICIMOD, Kathmandu, Nepal
[7] LEGOS, Toulouse, France
[8] Ohio State Univ, Sch Earth Sci, Columbus, OH 43210 USA
[9] CALTECH, Jet Prop Lab, Pasadena, CA 91125 USA
来源
关键词
D O I
10.1109/MGRS.2014.2345414
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
Building on a recent suite of work that has demonstrated theoretical feasibility and operational readiness of a satellite altimeter based flood forecasting system, we recently put a progressively designed altimeter based transboundary flood forecasting system to the ultimate test of real-time operational delivery in Bangladesh. The JASON-2 satellite altimeter, which was in orbit at the time of writing this manuscript, was used as the flagship altimeter mission. This paper summarizes the entire process of designing the system, customizing the workflow, and putting the system in place for complete ownership by the Bangladesh stakeholder agency for a 100 day operational skill test spanning the period of June 1 2013 through Sept. 9, 2013. Correlation for most of the flood warning stations ranged between 0.95 to 0.80 during the 1 day to 8 days lead time range. The RMSE of forecast typically ranged between 0.75m to 1.5m at locations where the danger level relative to the river bed was more than an order higher (i.e., > 20m). The RMSE of forecast at the 8 days lead time did not exceed 2m for upstream and mid-stream rivers inside Bangladesh. The RMSE of forecast at the 8 days lead time exceeded 2m at a few estuarine river locations affected by tidal effects, where danger level relative to river bed was smaller (i.e., < 20m). Such a satellite altimeter system, such as one based on the JASON-2 altimeter, is now poised to serve the entire inhabitants of the Ganges-Brahmaputra-Meghna river basins as well as 30 or more flood-prone downstream nations currently deprived of real-time flow data from upstream nations.
引用
收藏
页码:27 / 36
页数:10
相关论文
共 50 条
  • [1] Challenges for flood risk management in flood-prone Sirajganj region of Bangladesh
    Ali, Md. H.
    Bhattacharya, B.
    Islam, A. K. M. S.
    Islam, G. M. T.
    Hossain, Md. S.
    Khan, A. S.
    [J]. JOURNAL OF FLOOD RISK MANAGEMENT, 2019, 12 (01):
  • [2] Flood preparedness in rural flood-prone area: a holistic assessment approach in Bangladesh
    Rahman, Md Mostafizur
    Shobuj, Ifta Alam
    Islam, Md. Rabiul
    Islam, Md. Rakibul
    Hossain, Md. Tanvir
    Alam, Edris
    Al Hattawi, Khawla Saeed
    Islam, Md Kamrul
    [J]. GEOMATICS NATURAL HAZARDS & RISK, 2024, 15 (01)
  • [3] Disability inclusiveness of early warning system: a study on flood-prone areas of Bangladesh
    Chisty, Musabber Ali
    Nazim, Ashrafuzzaman
    Rahman, Md. Mostafizur
    Dola, Syeda Erena Alam
    Khan, Nesar Ahmed
    [J]. DISASTER PREVENTION AND MANAGEMENT, 2021, 30 (4-5) : 494 - 509
  • [4] Livelihood Vulnerability to Flood Hazard: Understanding from the Flood-prone Haor Ecosystem of Bangladesh
    Hoq, Mohammad Shamsul
    Raha, Shankar Kumar
    Hossain, Mohammad Ismail
    [J]. ENVIRONMENTAL MANAGEMENT, 2021, 67 (03) : 532 - 552
  • [5] Livelihood Vulnerability to Flood Hazard: Understanding from the Flood-prone Haor Ecosystem of Bangladesh
    Mohammad Shamsul Hoq
    Shankar Kumar Raha
    Mohammad Ismail Hossain
    [J]. Environmental Management, 2021, 67 : 532 - 552
  • [6] Spatial analysis of flood-prone areas and flood discharge
    Marwah, S.
    Alwi, L.
    Astriwana
    Akinal
    Baharuddin, B.
    [J]. INTERNATIONAL CONFERENCE ON ENVIRONMENTAL ECOLOGY OF FOOD SECURITY, 2021, 681
  • [7] Flood-prone caravan parks in NSW - is the system failing?
    Yeo, Stephen
    Grech, Paul
    [J]. AUSTRALIAN JOURNAL OF EMERGENCY MANAGEMENT, 2006, 21 (03): : 12 - 21
  • [8] Development of a flood forecasting system in Bangladesh
    Jorgensen, GH
    Host-Madsen, J
    [J]. OPERATIONAL WATER MANAGEMENT, 1997, : 137 - 145
  • [9] Forecasting flood-prone areas using Shannon's entropy model
    Haghizadeh, Ali
    Siahkamari, Safoura
    Haghiabi, Amir Hamzeh
    Rahmati, Omid
    [J]. JOURNAL OF EARTH SYSTEM SCIENCE, 2017, 126 (03)
  • [10] Forecasting flood-prone areas using Shannon’s entropy model
    Ali Haghizadeh
    Safoura Siahkamari
    Amir Hamzeh Haghiabi
    Omid Rahmati
    [J]. Journal of Earth System Science, 2017, 126