SAFETY ANALYSIS ON THE BRIDGE TRAVERSED BY METRO DOUBLE-LINE TUNNELS

被引:0
|
作者
Lv Gaofeng [1 ]
Ni Yongjun [1 ]
Wei Qingchao [1 ]
He Haijian [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Civil Engn & Architecture, Beijing 100044, Peoples R China
关键词
metro tunnel; traversing construction; bridge; inconsistent settlement; safety analysis;
D O I
暂无
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Construction of metro tunnel traversing the existing urban bridge foundation is an ordinary form. Bridge safety menaced by traversing construction of metro section tunnel is highly concerned. Beisihuan Road of Beijing was traversed by the section tunnel with double lines between Olympic Sports Center Station and Olympic Park Station under Beichen Bridge along the north-south direction. For enhancing the global integrity and improving the deformation resisting capacity of the bridges, the foundation under bridge piers was specially designed and disposed as an integral reinforced concrete U-shape groove foundation to considerate the influence of the traversing construction of the section tunnel. During the construction of the section tunnel, disturbance on Beichen Bridge is inevitable which resulted in the additional settlement between the U-shape groove foundation and bridge piers. In this paper, taking the traversing construction of section tunnel through Beichen Bridge in Beijing as a case, based on the three dimensional model set up in FLAC-3D, the settlement and deformation due to the traversing construction of double-line tunnels of the existing bridge structures were calculated and analyzed in detail for the whole construction procedures. Subsequently, the inner forces of cap beams of No.2 Bridge were checked. It was shown from the calculating results that the deformation indices and the inner forces of the bridge components were lower than the corresponding allowable limit value. The availability of the construction method was validated by the monitoring data recorded in-situ.
引用
收藏
页码:183 / 189
页数:7
相关论文
共 50 条
  • [1] Optimized design of double-line tunnels for water transfer project
    Yang, Wanbin
    Xue, Xicheng
    Shuili Xuebao/Journal of Hydraulic Engineering, 2000, (10): : 48 - 51
  • [2] Observed Environment Response Caused by Construction of Double-Line Parallel Pipe Jacking Crossing over Metro Shield Tunnels
    Ying H.
    Yao Y.
    Wang K.
    Zhang C.
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2023, 57 (12): : 1639 - 1647
  • [3] Ground vibrations induced by the passage of double-line trains in underground tunnels
    He, Chao
    Zhou, Shunhua
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2023, 165
  • [4] Characteristics of Train Wind and Analysis of Personnel Safety in Double-Line Shield Tunnel
    Fei, Ruizhen
    Peng, Limin
    Shi, Chenghua
    Yang, Weichao
    ADVANCES IN COMPUTATIONAL MODELING AND SIMULATION, PTS 1 AND 2, 2014, 444-445 : 264 - 269
  • [5] Study on Influence of Construction Process of Double-Line Shield Tunnels on Frame Structure
    Hui Yang
    Hongtao Shi
    Xueliang Jiang
    Chan Liu
    Lei Yu
    Geotechnical and Geological Engineering, 2021, 39 : 1465 - 1484
  • [6] Influences of shield tunnel construction of double-line metro on settlement of existing pipeline
    Guan X.M.
    Wang G.
    Wang X.C.
    An J.Y.
    Lei H.B.
    Guan W.Z.
    Wang, X.C. (xcwang2008@foxmail.com), 1600, Eastern Macedonia and Thrace Institute of Technology (13): : 167 - 173
  • [7] Study on Influence of Construction Process of Double-Line Shield Tunnels on Frame Structure
    Yang, Hui
    Shi, Hongtao
    Jiang, Xueliang
    Liu, Chan
    Yu, Lei
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2021, 39 (02) : 1465 - 1484
  • [8] Safety Simulation Analysis on the Under Construction Metro Station Structure Traversed by the New Metro Station
    Wang, Chunhui
    Peng, Hua
    INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6, 2011, : 1181 - 1185
  • [9] The double-line sign
    Zurlo, JV
    RADIOLOGY, 1999, 212 (02) : 541 - 542