A hybrid genetic algorithm for a loading problem in flexible manufacturing systems

被引:7
|
作者
Basnet, C. [1 ]
机构
[1] Univ Waikato, Dept Management Syst, Hamilton, New Zealand
关键词
flexible manufacturing systems; genetic algorithm; planning and scheduling; machine loading; TOOL ALLOCATION PROBLEM; DOMINANT GENES; TABU SEARCH; FMS; CAPACITY; SOLVE;
D O I
10.1080/00207543.2010.543935
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
One of the operating decisions involved in the scheduling of flexible manufacturing systems (FMS) is that of loading the FMS. Given a pool of jobs, which can be processed on alternate machines and alternate tools, the scheduler has to decide on the allocation of tools and machines to the different jobs. Various versions of this problem have appeared in the literature. We consider the version where jobs are selected for processing in a FMS in a planning horizon, operations for these jobs are assigned to machines, and corresponding tools are allocated to the slots in the machines. The objective is to minimise system unbalance. A hybrid genetic algorithm is presented that addresses this problem. Computational comparison between the genetic algorithm and previous algorithms is presented.
引用
收藏
页码:707 / 718
页数:12
相关论文
共 50 条
  • [1] A HEURISTIC ALGORITHM FOR THE LOADING PROBLEM IN FLEXIBLE MANUFACTURING SYSTEMS
    KUHN, H
    [J]. INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 1995, 7 (03): : 229 - 254
  • [3] Scheduling tool for flexible manufacturing systems using hybrid genetic algorithm
    Noor, Sahar
    Khan, M. K.
    Hussain, Iftikhar
    Ullah, Irfan
    [J]. SECOND INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES 2006, PROCEEDINGS, 2006, : 554 - +
  • [4] A hybrid genetic algorithm for the container loading problem
    Bortfeldt, A
    Gehring, H
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 131 (01) : 143 - 161
  • [5] A genetic algorithm for scheduling flexible manufacturing systems
    N. Jawahar
    P. Aravindan
    S. G. Ponnambalam
    [J]. The International Journal of Advanced Manufacturing Technology, 1998, 14 : 588 - 607
  • [6] A genetic algorithm for scheduling flexible manufacturing systems
    Jawahar, N
    Aravindan, P
    Ponnambalam, SG
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 1998, 14 (08): : 588 - 607
  • [7] CONSTRAINT-CHROMOSOME GENETIC ALGORITHM FOR FLEXIBLE MANUFACTURING SYSTEM MACHINE-LOADING PROBLEM
    Yusof, Umi Kalsom
    Budiarto, Rahmat
    Deris, Safaai
    [J]. INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2012, 8 (3A): : 1591 - 1609
  • [8] BLOCK ANGULAR STRUCTURES AND THE LOADING PROBLEM IN FLEXIBLE MANUFACTURING SYSTEMS
    KOUVELIS, P
    LEE, HL
    [J]. OPERATIONS RESEARCH, 1991, 39 (04) : 666 - 676
  • [9] Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm
    Kumar, Akhilesh
    Prakash
    Tiwari, M. K.
    Shankar, Ravi
    Baveja, Alok
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (02) : 1043 - 1069
  • [10] New branch and bound algorithm for loading problems in flexible manufacturing systems
    Kim, Yeong-Dae
    Yano, Candace Arai
    [J]. International Journal of Flexible Manufacturing Systems, 1994, 6 (04): : 361 - 382