Design of kitting system in lean-based assembly lines

被引:27
|
作者
Kilic, Huseyin Selcuk [1 ]
Durmusoglu, Mehmet Bulent [2 ]
机构
[1] Marmara Univ, Dept Ind Engn, Istanbul, Turkey
[2] Istanbul Tech Univ, Dept Ind Engn, TR-80626 Istanbul, Turkey
关键词
Assembly lines; Lean production; Parts; Assembly feeding; Kitting; Mixed integer LP model; PERFORMANCE; STOCKING; KITS;
D O I
10.1108/01445151211244357
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Purpose - The purpose of this paper is to develop a mathematical model for designing the kitting system by determining the optimum values of the related design parameters. Design/methodology/approach - Main assembly feeding systems are explained with their advantages and disadvantages. Related literature is reviewed and gaps are determined. To fill the void and to be beneficial for real life lean assembly systems, the elements of the kitting system are explained in detail and a mathematical model minimizing the cost consisting of Work In Process (WIP) and number of workers for the design of a kitting system is developed. A numerical example is presented to demonstrate the applicability of the model. Findings - This paper provides a mathematical model that provides the required design parameters for a kitting system such as the tour period, the number of workers and the quantities of the kits by minimizing WIP and labor costs. Originality/value - The paper provides a mathematical model for the design of a kitting system.
引用
收藏
页码:226 / 234
页数:9
相关论文
共 50 条
  • [1] Design methodology for a hybrid part feeding system in lean-based assembly lines
    Usta, Saliha Karadayi
    Oksuz, Mehmet Kursat
    Durmusoglu, Mehmet Bulent
    [J]. ASSEMBLY AUTOMATION, 2017, 37 (01) : 84 - 102
  • [2] The challenges of lean manufacturing implementation in kitting assembly
    Fansuri, A. F. H.
    Rose, A. N. M.
    Mohamed, N. M. Z. Nik
    Ahmad, H.
    [J]. 4TH INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING RESEARCH (ICMER2017), 2017, 257
  • [3] A lean-based ORR system for non-repetitive manufacturing
    Portioli-Staudacher, Alberto
    Tantardini, Marco
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (12) : 3257 - 3273
  • [4] Lean-based clean earthworks operation
    Belayutham, Sheila
    Gonzalez, Vicente A.
    Yiu, Talc Wing
    [J]. JOURNAL OF CLEANER PRODUCTION, 2017, 142 : 2195 - 2208
  • [5] Modeling Errors in Kitting Processes for Assembly Lines Feeding
    Caputo, Antonio C.
    Pelagagge, Pacifico M.
    Salini, Paolo
    [J]. IFAC PAPERSONLINE, 2015, 48 (03): : 338 - 344
  • [6] KITTING PROCESS IN A STOCHASTIC ASSEMBLY SYSTEM
    SOM, P
    WILHELM, WE
    DISNEY, RL
    [J]. QUEUEING SYSTEMS, 1994, 17 (3-4) : 471 - 490
  • [7] Lean-Based Integrated Approach for Manual Work Design Optimization in Modular Construction
    Zaalouk, Ahmed
    Han, SangHyeok
    [J]. CONSTRUCTION RESEARCH CONGRESS 2022: HEALTH AND SAFETY, WORKFORCE, AND EDUCATION, 2022, : 335 - 344
  • [8] Lean assessment tool for workstation design of assembly lines
    Goncalves, Micael Teixeira
    Salonitis, Konstantinos
    [J]. COMPLEX SYSTEMS ENGINEERING AND DEVELOPMENT, 2017, 60 : 386 - 391
  • [9] Optimizing kitting cells in mixed-model assembly lines
    Schmid, Nico A.
    Bao, Wencang
    Derhami, Shahab
    Montreuil, Benoit
    Limere, Veronique
    [J]. IFAC PAPERSONLINE, 2021, 54 (01): : 163 - 168
  • [10] A Lean-Based Process Redesign: Resource Utilization In the SPEED Trial
    Mink, J.
    Werzen, A.
    Wescott, J. N.
    Levine, B.
    Reed, J. F., III
    Reese, C. L.
    Sweeney, T.
    Farley, H.
    Jasani, N.
    [J]. ANNALS OF EMERGENCY MEDICINE, 2010, 56 (03) : S12 - S12