Research on Bi-Objective Scheduling Problems Subjected to Special Process Constraint on Parallel Machines

被引:0
|
作者
Gao, Jiaquan [1 ]
Zhao, Duanyang [1 ]
He, Guixia [1 ]
机构
[1] Zhejiang Univ Technol, Zhijiang Coll, Hangzhou 310024, Zhejiang, Peoples R China
关键词
D O I
10.1109/ICINFA.2008.4608189
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The study presents a bi-objective scheduling model on parallel machines(BOSP), and proposes a new genetic algorithm (VIGA) based on the vector group encoding method and the immune method. Compared with other scheduling problems on parallel machines, The BOSP is distinct for the following characteristics: (1) parallel machines are non-identical; (2) the sort of jobs processed on every machine can be restricted; (3) take minimizing the total tardiness penalty and minimizing the total completion time into account as a bi-objective problem. For VIGA, its two distinct characteristics are described as follows. On one hand, individuals are represented by a vector group, which can effectively reflect the virtual scheduling policy; On the other hand, an immune operator is adopted and studied in order to guarantee diversity of the population and improve quality of the population. Numerical experiments show that it is efficient, and is superior to the genetic algorithm which is the same as VIGA without the immune operator. A much better prospect of application can be optimistically expected.
引用
收藏
页码:1236 / 1241
页数:6
相关论文
共 50 条
  • [1] Research on Immune Genetic Algorithm for Solving Bi-Objective Scheduling Problems Subjected to Special Process Constraint
    Gao, Jiaquan
    He, Guixia
    Wang, Yushun
    2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 1994 - +
  • [2] Bi-Objective Scheduling on Parallel Machines in Fuzzy Environment
    Sharma, Sameer
    Gupta, Deepak
    Sharma, Seema
    PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON SOFT COMPUTING FOR PROBLEM SOLVING (SOCPROS 2012), 2014, 236 : 365 - 372
  • [3] Multi-Objective Scheduling Problems Subjected to Special Process Constraint
    Gao, Jiaquan
    He, Guixia
    Wang, Yushun
    Liu, Feng
    2008 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-8, 2008, : 105 - +
  • [4] Bi-Objective Flow Shop Scheduling with Equipotential Parallel Machines
    Malhotra, K.
    Gupta, D.
    Goel, S.
    Tripathi, A. K.
    MALAYSIAN JOURNAL OF MATHEMATICAL SCIENCES, 2022, 16 (03): : 451 - 470
  • [5] Bi-objective scheduling on uniform parallel machines considering electricity cost
    Zeng, YiZeng
    Che, Ada
    Wu, Xueqi
    ENGINEERING OPTIMIZATION, 2018, 50 (01) : 19 - 36
  • [6] A new parallel genetic algorithm for solving multiobjective scheduling problems subjected to special process constraint
    Gao, Jiaquan
    He, Guixia
    Wang, Yushun
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 43 (1-2): : 151 - 160
  • [7] A new parallel genetic algorithm for solving multiobjective scheduling problems subjected to special process constraint
    Jiaquan Gao
    Guixia He
    Yushun Wang
    The International Journal of Advanced Manufacturing Technology, 2009, 43 : 151 - 160
  • [8] Augmented ε-constraint-based matheuristic methodology for Bi-objective production scheduling problems
    Fan, Jiaxin
    IET COLLABORATIVE INTELLIGENT MANUFACTURING, 2024, 6 (04)
  • [9] Solving a bi-objective unrelated parallel batch processing machines scheduling problem: A comparison study
    Shahidi-Zadeh, B.
    Tavakkoli-Moghaddam, R.
    Taheri-Moghadam, A.
    Rastgar, I.
    COMPUTERS & OPERATIONS RESEARCH, 2017, 88 : 71 - 90
  • [10] A Pareto evolutionary algorithm approach to bi-objective unrelated parallel machine scheduling problems
    Chyu, Chiuh-Cheng
    Chang, Wei-Shung
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (5-8): : 697 - 708