Thermodynamic evaluation of a waste gas-fired steam power plant in an iron and steel facility using enhanced exergy analysis

被引:16
|
作者
Yilmaz, Kadir [1 ]
Kayfeci, Muhammet [2 ]
Kecebas, Ali [3 ]
机构
[1] Karabuk Univ, Grad Sch Nat & Appl Sci, Dept Energy Syst Engn, Karabuk, Turkey
[2] Karabuk Univ, Fac Technol, Dept Energy Syst Engn, Karabuk, Turkey
[3] Mugla Sitki Kocman Univ, Fac Technol, Dept Energy Syst Engn, Mugla, Turkey
关键词
Iron and steel facility; Waste gases; Boiler; Steam power plant; Enhanced exergy analysis; Thermodynamic performance; COMBINED-CYCLE; BLAST-FURNACE; EXERGOECONOMIC ANALYSIS; ENERGY EFFICIENCY; GENERATION SYSTEM; EUROPEAN IRON; CHINA IRON; OPTIMIZATION; IMPROVEMENTS; DESTRUCTION;
D O I
10.1016/j.energy.2018.12.007
中图分类号
O414.1 [热力学];
学科分类号
摘要
Since the industrial revolution to nowadays, many waste gases have been produced in iron-steel facilities. These gases increased the amount of energy consumption and risky by CO2 emissions. For these reasons, the useful waste gases, energy saving and decreased emissions technology are made. In this study, a collection of real operating data has been performed in an existing steam power plant using the useful waste gas that has occurred in iron and steel production facilities according to their nature, traditional and enhanced exergy analyses of it. The thermodynamic performance of the system is evaluated by improvement potential of the system components and by the interaction between the components. Useful waste gases produced in the facility consist of blast furnace gas, coke oven gas and converter gas. These gases are used for boosting the pressure and temperature of the circulation water by means of the heat of the exhaust gas produced by burning them at the steam-powered Rankine cycle's boiler and its subcomponents. The results of the study showed that the traditional and the enhanced exergy efficiencies of the system are respectively 60.7% and 83.7%. Potential improvement of the system and the interaction between the components are determined as 24.8% (low) and 74.5% (high). System components with improvement priority are condenser; combustion chamber, turbine, first super-heater and economizer at the traditional exergy analysis; whereas a combustion chamber, turbine, first superheater, economizer and second super-heater at the enhanced exergy analysis. Thus, as a similar result to those for all conversion thermal systems, combustion chamber is a component that always needs to be improved. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:684 / 695
页数:12
相关论文
共 50 条
  • [1] Energy and exergy analyses of partial repowering of a natural gas-fired steam power plant
    Ahmadi, Gholamreza
    Akbari, Omid Ali
    Zarringhalam, Majid
    INTERNATIONAL JOURNAL OF EXERGY, 2017, 23 (02) : 149 - 168
  • [2] Energy and exergy analyses of partial repowering of a natural gas-fired steam power plant
    Ahmadi G.
    Akbari O.A.
    Zarringhalam M.
    Ahmadi, Gholamreza (Gholamreza.ahmadi@iaukhsh.ac.ir), 1600, Inderscience Enterprises Ltd., 29, route de Pre-Bois, Case Postale 856, CH-1215 Geneva 15, CH-1215, Switzerland (23): : 149 - 168
  • [3] Combined Cycle and Steam Gas-Fired Power Plant Analysis through Exergoeconomic and Extended Combined Pinch and Exergy Methods
    Manesh, M. H. Khoshgoftar
    Rosen, M. A.
    JOURNAL OF ENERGY ENGINEERING, 2018, 144 (02)
  • [4] Evaluation of supply boiler repowering of an existing natural gas-fired steam power plant
    Akbari, Omidali
    Marzban, Ali
    Ahmadi, Gholamreza
    APPLIED THERMAL ENGINEERING, 2017, 124 : 897 - 910
  • [5] Waste heat recovery from a landfill gas-fired power plant
    Gewald, Daniela
    Siokos, Konstantinos
    Karellas, Sotirios
    Spliethoff, Hartmut
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2012, 16 (04): : 1779 - 1789
  • [6] Exergetic analysis and evaluation of coal-fired supercritical thermal power plant and natural gas-fired combined cycle power plant
    Reddy, V. Siva
    Kaushik, S. C.
    Tyagi, S. K.
    CLEAN TECHNOLOGIES AND ENVIRONMENTAL POLICY, 2014, 16 (03) : 489 - 499
  • [7] Exergetic analysis and evaluation of coal-fired supercritical thermal power plant and natural gas-fired combined cycle power plant
    V. Siva Reddy
    S. C. Kaushik
    S. K. Tyagi
    Clean Technologies and Environmental Policy, 2014, 16 : 489 - 499
  • [8] The value of enhanced flexibility of gas-fired power plants: A real options analysis
    Glensk, Barbara
    Madlener, Reinhard
    APPLIED ENERGY, 2019, 251
  • [9] Thermodynamic evaluation of a geothermal power plant for advanced exergy analysis
    Kecebas, Ali
    Gokgedik, Harun
    ENERGY, 2015, 88 : 746 - 755
  • [10] Energy, exergy, and economic evaluation of integrated waste incineration facility with a thermal power plant
    Sabagh, Farid Aghapour
    Hossainpour, Siamak
    Pourhemmati, Shayan
    ENERGY CONVERSION AND MANAGEMENT-X, 2023, 20