The Decommissioning of the ENEA RB3 Research Reactor in Montecuccolino

被引:0
|
作者
Rocchi, F. [1 ]
Castellani, C. M. [2 ]
Compagno, A. [4 ]
Vilardi, I. [5 ]
Lorenzelli, R. [6 ]
Rizzo, A. [3 ]
机构
[1] ENEA FSN SICNUC SIN, Via Martini di Monte Sole 4, Bologna, BO, Italy
[2] ENEA IRP, Via Martini di Monte Sole 4, Bologna, BO, Italy
[3] ENEA FSN SICNUC TNM, Via Martini di Monte Sole 4, Bologna, BO, Italy
[4] ENEA FSN FISS CRGR, Via Anguillarese 301, I-00123 Santa Maria Di Galeria, RM, Italy
[5] ENEA IRP SFA, Via Anguillarese 301, I-00123 Santa Maria Di Galeria, RM, Italy
[6] ENEA FSN SICNUC SIN, I-40032 Camugnano, BO, Italy
来源
关键词
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The ENEA RB3 reactor was a 100 Wth research installation owned and operated by ENEA, in its center of Montecuccolino near Bologna, from 1971 to 1989. It consisted of a cylindrical aluminium vessel, about 4.3 m high and 2.9 m in diameter, which could host various types of fuel elements suspended from the top of a special adjustable rack and submerged into moderating and cooling heavy water. Principal aim of the reactor was to provide neutronics data for the CIRENE NPP, a SGHWR that was being designed and then partially built in Latina starting from 1979. The specific RB3 core, surrounded by a graphite reflector and housed inside a concrete biological shielding, allowed to test easily very different fuel element configurations by changing their pitches and by regulating the heavy water level inside the vessel. The reactor design, similar to that of the ZED-II Canadian research facility, was originally developed by CEA for its Aquilon facility in Saclay in 1956; in fact, through a special arrangement between ENEA and CM, parts of the Aquilon facility were ultimately donated to ENEA at the end of the 60s for the construction of RB3. In 1989, the RB3 reactor was shut down, and in the late 2010 ENEA received by ministerial decree the authorization to its dismantling, with the aim of reaching the "green field" status and with the unconditional release of its building, which is actually owned by the University of Bologna. The dismantling activities started in May 2013 and were concluded at the end of 2014; after that, a campaign for the radiological characterization of the building was initiated and concluded in June 2015. Now, all the necessary site characterization activities are being conducted with the aim to present the results declaring the "green field" status before the end of 2017. This paper will present the three main pillars of the decommissioning of RB3, namely the strategy and methods for the dismantling, the strategy and methods for the radiological characterization of the building, and finally the strategy and methods for the radiological characterization of the site. The radionuclide limits imposed by the Italian Regulatory Body, together with the challenges encountered so far will be likewise shown and described.
引用
下载
收藏
页码:241 / 245
页数:5
相关论文
共 50 条
  • [1] ENEA PLANS RESEARCH REACTOR
    不详
    NUCLEONICS, 1963, 21 (11): : 26 - &
  • [2] DECOMMISSIONING OF THE SALASPILS RESEARCH REACTOR
    Abramenkovs, Andris
    NUCLEAR TECHNOLOGY & RADIATION PROTECTION, 2011, 26 (01): : 78 - 83
  • [3] DECOMMISSIONING OF THE RESEARCH AND MEASUREMENT REACTOR OF THE PTB
    OBERPOTTKAMP, U
    PTB-MITTEILUNGEN, 1994, 104 (05): : 382 - 385
  • [4] DECOMMISSIONING OF A UNIVERSITY-RESEARCH REACTOR
    ABELQUIST, EW
    HUDA, A
    STATE, S
    TAKAHASHI, J
    HEALTH PHYSICS, 1994, 67 (01): : 80 - 87
  • [5] The decommissioning of the Georgia Tech Research Reactor
    Hertel, NE
    Ice, RD
    Eby, RS
    PROCEEDINGS OF THE TOPICAL MEETING ON RADIATION PROTECTION FOR OUR NATIONAL PRIORITIES: MEDICINE, THE ENVIRONMENT, AND THE LEGACY, 2000, : 679 - 688
  • [6] Decommissioning of the reactor vessel with components in multipurpose research reactor
    Czeslik, P
    Demant, W
    Schmidt, D
    Stanke, D
    ANNUAL MEETING ON NUCLEAR TECHNOLOGY '98, PROCEEDINGS, 1998, : 485 - 488
  • [7] Decommissioning and delicensing of the Universities Research Reactor
    England, MR
    Ward, A
    Lyons, J
    NUCLEAR ENERGY-JOURNAL OF THE BRITISH NUCLEAR ENERGY SOCIETY, 1997, 36 (06): : 411 - 416
  • [8] INITIAL DECOMMISSIONING PLANNING FOR THE BUDAPEST RESEARCH REACTOR
    Toth, Gabor
    NUCLEAR TECHNOLOGY & RADIATION PROTECTION, 2011, 26 (01): : 92 - 99
  • [9] Development of a decommissioning strategy for the MR research reactor
    Bylkin, B.
    Craig, D.
    Fecitt, L.
    Gorlinsky, Y.
    Harman, N.
    Jackson, R.
    Kolyadin, V.
    Lobach, Y.
    Pavlenko, V.
    KERNTECHNIK, 2010, 75 (1-2) : 30 - 34
  • [10] A dammarane glycoside derived from ginsenoside Rb3
    He, KJ
    Liu, Y
    Yang, Y
    Li, P
    Yang, L
    CHEMICAL & PHARMACEUTICAL BULLETIN, 2005, 53 (02) : 177 - 179