ANFIS based Machine Repair Model with Control Policies and Working Vacation

被引:5
|
作者
Sethi, Rachita [1 ]
Bhagat, Amita [2 ]
Garg, Deepika [1 ]
机构
[1] GD Goenka Univ, Dept Math, Gurugram 122103, India
[2] Jaypee Inst Informat Technol, Dept Math, Noida 201309, India
关键词
Machine-repair; Start-up time; Threshold recovery; Cost analysis; ANFIS; QUEUING SYSTEM; QUEUES; ARRIVAL; TIME;
D O I
10.33889/IJMEMS.2019.4.6-120
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study is concerned with the transient state analysis of M/M/1 machine repairable system consisting of M operating units. F-policy is quite useful to avoid the overloading of failed machines that arrive for repair in the system. The failed machines are repaired by a server that is susceptible to failure and follows the threshold recovery while being repaired. The server leaves for a vacation if there are no machines waiting in the system for the repair. Runge-Kutta method is implemented to solve the governing equations and evaluate the system's state probabilities. Cost function is also designed to determine the system's minimum cost. In addition, the numerical outcomes acquired by the Runge-Kutta method are compared with the results generated by adaptive neuro-fuzzy inference system (ANFIS).
引用
收藏
页码:1522 / 1533
页数:12
相关论文
共 50 条
  • [1] Cost Analysis and Optimization of Machine Repair Model with Working Vacation and Feedback–Policy
    Deora P.
    Kumari U.
    Sharma D.C.
    International Journal of Applied and Computational Mathematics, 2021, 7 (6)
  • [2] Vacation policies for machine repair problem with two type spares
    Ke, Jau-Chuan
    Wang, Kuo-Hslung
    APPLIED MATHEMATICAL MODELLING, 2007, 31 (05) : 880 - 894
  • [3] Finite-capacity M/M/2 machine repair model with impatient customers, triadic discipline, and two working vacation policies
    Kadi, Abir
    Touche, Nassim
    Bouchentouf, Amina Angelika
    Boualem, Mohamed
    JOURNAL OF MATHEMATICAL MODELING, 2025, 13 (01): : 183 - 200
  • [4] Performance analysis of machine repair system with single working vacation
    He, Gang
    Wu, Wenqing
    Zhang, Yuanyuan
    COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2019, 48 (22) : 5602 - 5620
  • [5] Controlled Arrival Machine Repair Problem with Working Vacation and Reattempts
    Bhagat, Amita
    Sethi, Rachita
    Garg, Deepika
    INTERNATIONAL JOURNAL OF MATHEMATICAL ENGINEERING AND MANAGEMENT SCIENCES, 2021, 6 (01) : 279 - 295
  • [6] Cost Analysis of a vacation machine repair model
    Ke, Jau-Chuan
    Wu, Chia-Huang
    Liou, Cheng-Hwai
    Wang, Tsung-Yin
    INTERNATIONAL CONFERENCE ON ASIA PACIFIC BUSINESS INNOVATION AND TECHNOLOGY MANAGEMENT (APBITM), 2011, 25
  • [7] Performance Analysis of Machine Repair Problem with Working Vacation and Service Interruptions
    Sethi, Rachita
    Bhagat, Amita
    EMERGING TRENDS IN MATHEMATICAL SCIENCES AND ITS APPLICATIONS, 2019, 2061
  • [8] Optimal management of the machine repair problem with working vacation: Newton's method
    Wang, Kuo-Hsiung
    Chen, Wei-Lun
    Yang, Dong-Yuh
    JOURNAL OF COMPUTATIONAL AND APPLIED MATHEMATICS, 2009, 233 (02) : 449 - 458
  • [9] Performance Sensitivity Analysis for Machine Repair Problem with Two Failure Modes and Working Vacation
    Wu, Chia-Huang
    Yang, Dong-Yuh
    Ko, Min-Hui
    INTERNATIONAL JOURNAL OF RELIABILITY QUALITY AND SAFETY ENGINEERING, 2024, 31 (02)
  • [10] Analysis of MAP/PH/1 Model with Working Vacation, Working Breakdown and Two-Phase Repair
    Thakur, Sonali
    Jain, Anamika
    Ahuja, Anjali
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2024, 49 (05) : 7431 - 7451