Energy-efficient bi-objective manufacturing scheduling with intermediate buffers using a three-stage genetic algorithm

被引:1
|
作者
Zhang, Wenyu [1 ]
Ding, Jiepin [1 ]
Wang, Yan [1 ]
Zhang, Shuai [1 ]
Zhuang, Xiaoyu [1 ]
机构
[1] Zhejiang Univ Finance & Econ, Sch Informat Management & Artificial Intelligence, Hangzhou 310018, Peoples R China
基金
浙江省自然科学基金; 中国国家自然科学基金;
关键词
Flexible multi-task scheduling; Energy consumption; Intermediate buffer; Bi-objective optimization; Pareto; Genetic algorithm; SHOP; CONSUMPTION; SEARCH;
D O I
10.3233/JIFS-191072
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The flexible multi-task scheduling problem has been extensively investigated in manufacturing systems, and its objectives are often related to the quality of manufacturing services. However, energy-related objectives along with workload balance have rarely been considered. Thus, a novel bi-objective optimization model is proposed to achieve green manufacturing. The Pareto-based fitness evaluation is employed to make a trade-off between total energy consumption and workload balance. Intermediate buffers are also considered, making the model more practical and more complicated. To solve the proposed model, a new three-stage genetic algorithm (3S-GA) is presented. A Pareto-based adaptive population size method is proposed to maintain the diversity of the population and ensure the convergence rate. To cope with the subtask sequencing complexity, a real-time sequence scheduling heuristic is explored to effectively initialize the subtask sequence to save the energy in manufacturing systems, which is designed by minimizing the standby time according to the laxity of subtasks. After a series of experimental designs based on the Taguchi method, a suitable parameter combination of the 3S-GA is utilized. Further, computational experiments based on five instances demonstrate that the 3S-GA outperforms other four baseline algorithms taken from the literature in solving the proposed bi-objective optimization model.
引用
收藏
页码:289 / 304
页数:16
相关论文
共 50 条
  • [1] A BI-OBJECTIVE OPTIMIZATION ALGORITHM FOR AUTOMOBILE MANUFACTURING SCHEDULING
    Alatangaowa, B.
    Batbileg, S.
    Enkhbat, R.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2020, 19 (01) : 146 - 156
  • [2] Bi-objective scheduling for energy-efficient distributed assembly blocking flow shop
    Du, Song-Lin
    Zhou, Wen-Ju
    Fei, Min-Rui
    Nee, A. Y. C.
    Ong, S. K.
    CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2024, 73 (01) : 357 - 360
  • [3] Bi-objective energy-efficient scheduling in a seru production system considering reconfiguration of serus
    Lian, Jie
    Li, Wenjuan
    Pu, Guoli
    Zhang, Pengwei
    SUSTAINABLE COMPUTING-INFORMATICS & SYSTEMS, 2023, 39
  • [4] NSGA-II with Iterated Greedy for a Bi-objective Three-stage Assembly Flowshop Scheduling Problem
    Campos, Saulo Cunha
    Claudio Arroyo, Jose Elias
    GECCO'14: PROCEEDINGS OF THE 2014 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 2014, : 429 - 436
  • [5] Three-Stage Resource Allocation Algorithm for Energy-Efficient Heterogeneous Networks
    Coskun, Cemil Can
    Davaslioglu, Kemal
    Ayanoglu, Ender
    IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, 2017, 66 (08) : 6942 - 6957
  • [6] An Efficient Weighted Bi-objective Scheduling Algorithm for Heterogeneous Systems
    Sardina, Idalmis Milian
    Boeres, Cristina
    Drummond, Lucia Maria de A.
    EURO-PAR 2009 PARALLEL PROCESSING WORKSHOPS, 2010, 6043 : 102 - 111
  • [7] An efficient weighted bi-objective scheduling algorithm for heterogeneous systems
    Boeres, Cristina
    Sardina, Idalmis Milian
    Drummond, Lucia M. A.
    PARALLEL COMPUTING, 2011, 37 (08) : 349 - 364
  • [8] Energy-efficient bi-objective single-machine scheduling with power-down mechanism
    Che, Ada
    Wu, Xueqi
    Peng, Jing
    Yan, Pengyu
    COMPUTERS & OPERATIONS RESEARCH, 2017, 85 : 172 - 183
  • [9] Bi-objective scheduling for reentrant hybrid flow shop using Pareto genetic algorithm
    Cho, Hang-Min
    Bae, Suk-Joo
    Kim, Jungwuk
    Jeong, In-Jae
    COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (03) : 529 - 541
  • [10] Bi-objective optimization using an improved NSGA-II for energy-efficient scheduling of a distributed assembly blocking flowshop
    Niu, Wei
    Li, Jun-qing
    Jin, Hui
    Qi, Rui
    Sang, Hong-yan
    ENGINEERING OPTIMIZATION, 2023, 55 (05) : 719 - 740