Application of MFL on Girth-Weld Defect Detection of Oil and Gas Pipelines

被引:19
|
作者
Dai, L. S. [1 ]
Feng, Q. S. [2 ]
Sutherland, J. [3 ]
Wang, T. [2 ]
Sha, S. Y. [2 ]
Wang, F. X. [4 ]
Wang, D. P. [1 ]
机构
[1] Tianjin Univ, Sch Mat Sci & Engn, Tianjin 300072, Peoples R China
[2] PetroChina Pipeline Co, 408 Xinhua Rd, Langfang 065000, Peoples R China
[3] Baker Hughes, 17021 Aldine Westfield Rd, Houston, TX 77073 USA
[4] PetroChina Pipeline R&D Ctr, 51 Jinguang Rd, Langfang 065000, Peoples R China
关键词
Girth weld (GW); Defect; Magnetic flux leakage 4 (MFL4); Pull-through test; Excavation;
D O I
10.1061/(ASCE)PS.1949-1204.0000497
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Globally, the integrity of girth weld (GW) of oil and gas pipelines has increased as a concern due to failures with high consequences. A primary integrity issue to pipelines considers defects originating during field construction but over time may also be subject to external loads and stresses due to earth movement. GW defects in newly built pipelines are also assumed to exist but would be much smaller in size, and more difficult to detect, which motivated the investigation into minimum defect detection levels of the inspection technologies. Research objectives of this paper are to characterize and summarize the applicability of inline inspection (ILI) technology of magnetic flux leakage 4 (MFL4) for inspection of defects related to pipeline GWs. Pull-through test and infield site excavations of operational pipelines have been collected and used for detection, internal/external (int/ext) identification, and sizing quantification. It can be concluded that the MFL4 technique is generally sensitive to lack of fusion or penetration, deep undercut, local thinning with results of both pull test and field data; while not sensitive to closed or very narrow small dimension cracks (narrower than 1 mm, less than 2 mm deep) as was observed in this study. (c) 2020 American Society of Civil Engineers.
引用
收藏
页数:8
相关论文
共 50 条
  • [1] Application of USCCD on Girth Weld Defect Detection of Oil Pipelines
    Dai, L. S.
    Feng, Q. S.
    Xiang, X. Q.
    Sutherland, J.
    Wang, T.
    Wang, D. P.
    Wang, Z. J.
    APPLIED SCIENCES-BASEL, 2020, 10 (08):
  • [2] Defect Detection and Width Estimation in Natural Gas Pipelines using MFL Signals
    Kandroodi, Mojtaba Rostami
    Shirani, Farshad
    Araabi, Babak Nadjar
    Ahmadabadi, Majid Nili
    Bassiri, Maisam Mansoob
    2013 9TH ASIAN CONTROL CONFERENCE (ASCC), 2013,
  • [3] A high-accuracy prediction model for self height of girth weld defect in gas pipelines
    Zhang H.
    Liu Y.
    Que Y.
    Yang F.
    Mo R.
    Natural Gas Industry, 2022, 42 (07) : 101 - 109
  • [4] APPLICATION OF THE DIGITAL RADIOGRAPHY IN WELD INSPECTION OF GAS AND OIL PIPELINES
    Oliveira, Davi F.
    Moreira, Edson V.
    Silva, Aline S. S.
    Rabello, Jose M. B.
    Lopes, Ricardo T.
    Pereira, Marcelo S.
    Zscherpel, Uwe
    10TH EUROPEAN CONFERENCE ON NON-DESTRUCTIVE TESTING 2010 (ECNDT), VOLS 1-5, 2010, : 993 - 1003
  • [5] Weld defect intelligent identification for oil and gas pipelines based on the deep learning models
    Luo, Renze
    Wang, Lei
    Natural Gas Industry, 2024, 44 (09) : 199 - 208
  • [6] EVALUATION OF GIRTH WELD DEFECT ACCEPTANCE CRITERIA FOR GRADE X100 PIPELINES
    Swankie, Troy
    Chauhan, Vinod
    Wood, Ian
    Espiner, Richard
    Kieba, Max
    Quong, Spencer
    PROCEEDINGS OF THE 9TH INTERNATIONAL PIPELINE CONFERENCE - 2012, VOL 3, 2013, : 379 - 393
  • [7] Fatigue crack growth behavior in girth weld of natural gas transmission pipelines
    Kim, Young Pyo
    Kim, Cheol Man
    Kim, Woo Sik
    Shin, Kwang Seon
    MECHANICAL BEHAVIOR OF MATERIALS X, PTS 1AND 2, 2007, 345-346 : 303 - +
  • [8] Residual stress distribution in girth weld of oil and gas pipeline
    Li, Yukun
    Wang, Shanyao
    Yang, Jinchuan
    Xu, Chunyan
    Tian, Ye
    Jia, Haidong
    Cao, Xiaojian
    Zhongguo Shiyou Daxue Xuebao (Ziran Kexue Ban)/Journal of China University of Petroleum (Edition of Natural Science), 2021, 45 (06): : 161 - 167
  • [9] GIRTH WELD JOINTS FROM LONG UPSET PIPE ENDS FOR IMPROVING FATIGUE STRENGTH OF OFFSHORE OIL & GAS PIPELINES
    Marines-Garcia, Israel
    Aguilar, Aaron
    Aguilar, Ramon
    Pelcastre, Mauricio
    Darcis, Philippe
    PROCEEDINGS OF THE ASME 38TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2019, VOL 4, 2019,
  • [10] PREVENTING GIRTH WELD FAILURE IN PIPELINES: MEASUREMENT OF LOADS AND APPLICATION OF ASSESSMENT METHODS
    Young, Andy
    Andrews, Robert M.
    PROCEEDINGS OF THE ASME 2020 13TH INTERNATIONAL PIPELINE CONFERENCE (IPC2020), VOL 2, 2020,