Single-machine group-scheduling problems with deteriorating setup times and job-processing times

被引:77
|
作者
Wu, Chin-Chia [1 ]
Lee, Wen-Chiung [1 ]
机构
[1] Feng Chia Univ, Dept Stat, Taichung 40724, Taiwan
关键词
group technology; single machine; deteriorating jobs; makespan; sum of completion times;
D O I
10.1016/j.ijpe.2008.05.004
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
There is a growing interest in the research of deteriorating job-scheduling problems in recent years. However, the group technology is relatively unexplored in this field. In addition, the group setup times are assumed to be known and fixed. In reality, process setup or preparation often requires more time as food quality deteriorates or a patient's condition worsens. Therefore, this paper considers a situation where both setup times and job-processing times are lengthened as jobs wait to be processed. Specifically, two single-machine group-scheduling problems are investigated where the group setup times and the job-processing times are both increasing functions of their starting times. We first prove that the makespan minimization problem remains polynomially solvable when the deterioration is present. We then show that the sum of completion times problem is polynomially solvable when the numbers of jobs in each group are equal. For the case of unequal job sizes, a heuristic algorithm is proposed, and the computational experiments show that the performance of the heuristic is fairly accurately when the deterioration rate is small. (c) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:128 / 133
页数:6
相关论文
共 50 条
  • [1] Single-machine bicriterion group scheduling with deteriorating setup times and job processing times
    Wang, Jian-Jun
    Liu, Ya-Jing
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2014, 242 : 309 - 314
  • [2] Single-machine scheduling with deteriorating functions for job processing times
    Cheng, T. C. E.
    Lee, Wen-Chiung
    Wu, Chin-Chia
    [J]. APPLIED MATHEMATICAL MODELLING, 2010, 34 (12) : 4171 - 4178
  • [3] Single-Machine Group Scheduling Problems with Variable Job Processing Times
    Ji, Ping
    Li, Lin
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015
  • [4] Single-machine group scheduling with linearly decreasing time-dependent setup times and job processing times
    Wang, Ji-Bo
    Sun, Linyan
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (5-8): : 765 - 772
  • [5] Single-machine group scheduling with linearly decreasing time-dependent setup times and job processing times
    Ji-Bo Wang
    Linyan Sun
    [J]. The International Journal of Advanced Manufacturing Technology, 2010, 49 : 765 - 772
  • [6] Group scheduling with independent setup times, ready times, and deteriorating job processing times
    Wang, Ji-Bo
    Huang, Xue
    Wu, Yu-Bin
    Ji, Ping
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 60 (5-8): : 643 - 649
  • [7] Group scheduling with independent setup times, ready times, and deteriorating job processing times
    Ji-Bo Wang
    Xue Huang
    Yu-Bin Wu
    Ping Ji
    [J]. The International Journal of Advanced Manufacturing Technology, 2012, 60 : 643 - 649
  • [8] Single-machine scheduling with deteriorating jobs and setup times to minimize the maximum tardiness
    Cheng, T. C. E.
    Hsu, Chou-Jung
    Huang, Yi-Chi
    Lee, Wen-Chiung
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (12) : 1760 - 1765
  • [9] A single-machine group schedule with fuzzy setup and processing times
    Wu, Chin-Chia
    Lee, Wen-Chiung
    [J]. JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES, 2005, 26 (03): : 683 - 691
  • [10] A single-machine deteriorating job scheduling problem of minimizing the makespan with release times
    Lee, Wen-Chiung
    Wu, Chin-Chia
    Chung, Yu-Hsiang
    [J]. IMECS 2008: INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, VOLS I AND II, 2008, : 1952 - 1957