Corporate development with agile business process modeling as a key success factor

被引:27
|
作者
Paschek, Daniel [1 ]
Rennung, Frank [1 ]
Trusculescu, Adelin [1 ]
Draghici, Anca [1 ]
机构
[1] Politehn Univ Timisoara, Fac Management Prod & Transportat, 14 Remus Str, Timisoara 300191, Romania
关键词
Business Process Management; Business Process Modeling and Notation; Agile management; Scrum; Enterprise Information Management;
D O I
10.1016/j.procs.2016.09.273
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Business processes represent an important core component of the company's activities and should be therefore more considerate. It takes a long time until the processes modeled down to the smallest detail, analyzed and designed. When these steps have been completed, often the process will not be adapted. Here would be an agile approach interesting to be flexible on trends and enterprise decisions which will have any dependencies to the processes. For this reason, the purpose of this study is to develop a holistic approach, in which the advantages of the previous models can be optimally used and the current challenges such as the desired agility can be included. The research methodology used in the investigation consists of a combination of methods and tools of Business Process Management (BPM) and agile management. The aim of the research is to evaluate whether these methods can contribute positively to the process modeling improvement in the framework of the Enterprise Information System. The finding of this research consists of a holistic model for acting agile within BPM. This allows companies to act flexible to adapt or implement enterprise processes. The resulting added value can be seen in the model for flexible implementation with regular controlling which are set apart from the previous rigid waterfall models. (C) 2016 Published by Elsevier B.V.
引用
收藏
页码:1168 / 1175
页数:8
相关论文
共 50 条
  • [1] Business Process Management as a Key Factor for eHealth Success
    Tucek, David
    Janu, Tomas
    Opletalova, Michaela
    [J]. INTERNATIONAL ADVANCES IN ECONOMIC RESEARCH, 2020, 26 (02) : 207 - 208
  • [2] Business Process Management as a Key Factor for eHealth Success
    David Tucek
    Tomáš Janů
    Michaela Opletalova
    [J]. International Advances in Economic Research, 2020, 26 : 207 - 208
  • [3] Uses of business process modeling in agile software development projects
    Moyano, Cielo Gonzalez
    Pufahl, Luise
    Weber, Ingo
    Mendling, Jan
    [J]. INFORMATION AND SOFTWARE TECHNOLOGY, 2022, 152
  • [4] BUSINESS PROCESS DEVELOPMENT USING AGILE METHODOLOGY
    Rusu, Lucia
    Iuga, Marin
    Martin, Simon
    [J]. CRISES AFTER THE CRISIS: INQUIRIES FROM A NATIONAL, EUROPEAN AND GLOBAL PERSPECTIVE, VOL III, 2011, : 387 - 393
  • [5] Business Model as A Key Factor for Commercial Success
    Kiseleva, Irina
    Tramova, Aziza
    Mambetova, Fatimat
    Mustaev, Movsar
    Karakaeva, Elena
    [J]. REICE-REVISTA ELECTRONICA DE INVESTIGACION EN CIENCIAS ECONOMICAS, 2022, 10 (20): : 68 - 87
  • [6] Success factor business process management
    Felber, P
    [J]. KUNSTSTOFFE-PLAST EUROPE, 2005, 95 (11): : 28 - 32
  • [7] Entrepreneurial thinking as a key factor of family business success
    Hnatek, Milan
    [J]. Proceedings of the 3rd International Conference on Leadership, Technology and Innovation Management, 2015, 181 : 342 - 348
  • [8] Innovativeness: a key factor to support contractors' business success
    Setiawan, Harijanto
    Erdogan, Bilge
    Ogunlana, Stephen O.
    [J]. 3RD INTERNATIONAL CONFERENCE ON SUSTAINABLE CIVIL ENGINEERING STRUCTURES AND CONSTRUCTION MATERIALS - SUSTAINABLE STRUCTURES FOR FUTURE GENERATIONS, 2017, 171 : 379 - 386
  • [9] People over Process: Key Challenges in Agile Development
    Conboy, Kieran
    Coyle, Sharon
    Wang, Xiaofeng
    Pikkarainen, Minna
    [J]. IEEE SOFTWARE, 2011, 28 (04) : 48 - 57
  • [10] An agile method of modeling business process simulation for virtual enterprises
    Cheng, SW
    Xu, XF
    Wang, G
    Li, QL
    [J]. ICEBE 2005: IEEE INTERNATIONAL CONFERENCE ON E-BUSINESS ENGINEERING, PROCEEDINGS, 2005, : 87 - 92