An Economical Boil-Off Gas Management System for LNG Refueling Stations: Evaluation Using Scenario Analysis

被引:2
|
作者
Kim, Hyun-Seung [1 ,2 ]
Cho, Churl-Hee [2 ]
机构
[1] Korea Natl Oil Corp, 305 Jongga Ro, Ulsan 44538, South Korea
[2] Chungnam Natl Univ, Grad Sch Energy Sci & Technol, 99 Daehak Ro, Daejeon 34134, South Korea
关键词
LNG refueling station; boil-off gas (BOG); BOG management systems; cost estimation; sensitivity analysis; probability analysis; economy evaluation; greenhouse gas; CAPTURE;
D O I
10.3390/en15228526
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The use of liquefied natural gas (LNG) in the transportation sector is increasing, and boil-off gas (BOG) management systems are considered viable options to increase economic efficiency and reduce greenhouse gas emissions at LNG refueling stations. The present study proposed an economically optimized method by investigating four refueling station scenarios, including different BOG management systems. Among the four scenarios, the scenario in which compressed natural gas was produced from BOG had the lowest minimum selling price (MSP) and was the most economical. Sensitivity and uncertainty analyses were conducted for the economically optimal scenario, which identified the factors with the most influential impact and their uncertainties on the MSP. Finally, to determine the feasibility of the business through profitability analysis, the net present value, discounted payback period, and present value ratio due to changes in the discount rate were presented, and the discounted cash flow rate of return was found to be 13.22%. As a result of this study, a BOG management system can contribute to improving the economic feasibility for LNG refueling stations by reliquefying BOG and re-selling it (the most efficient way is scenario 4) and will provide an economical guide for countries with much demand for LNG in the transport sector.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Model based analysis of the boil-off gas management and control for LNG fuelled vessels
    Kalikatzarakis, Miltiadis
    Theotokatos, Gerasimos
    Coraddu, Andrea
    Sayan, Paul
    Wong, Seng Yew
    [J]. ENERGY, 2022, 251
  • [2] Optimal operation of the boil-off gas compression process using a boil-off rate model for LNG storage tanks
    Myung Wook Shin
    Dongil Shin
    Soo Hyoung Choi
    En Sup Yoon
    [J]. Korean Journal of Chemical Engineering, 2008, 25 : 7 - 12
  • [3] BOIL-OFF PREVENTION AND THERMAL MODELLING OF LNG FUELLING STATIONS
    Irina, Kovacova
    Vaclav, Chrz
    [J]. 14TH CRYOGENICS 2017 IIR INTERNATIONAL CONFERENCE (CRYOGENICS 2017), 2017, : 521 - 527
  • [4] Optimal operation of the boil-off gas compression process using a boil-off rate model for LNG storage tanks
    Shin, Myung Wook
    Shin, Dongil
    Choi, Soo Hyoung
    Yoon, En Sup
    [J]. KOREAN JOURNAL OF CHEMICAL ENGINEERING, 2008, 25 (01) : 7 - 12
  • [5] BOIL-OFF GAS VAPORS ARE RECOVERED BY RELIQUEFACTION IN LNG
    LERAY, M
    PETIT, P
    PARADOWSKI, H
    [J]. OIL & GAS JOURNAL, 1986, 84 (08) : 58 - 62
  • [6] Design of a boil-off natural gas reliquefaction control system for LNG carriers
    Shin, Younggy
    Lee, Yoon Pyo
    [J]. APPLIED ENERGY, 2009, 86 (01) : 37 - 44
  • [7] Greenhouse Gas Reduction by Utilization of Cold LNG Boil-off Gas
    Zakaria, Mohamad Shukri
    Osman, Kahar
    Abdullah, Haslina
    [J]. MALAYSIAN TECHNICAL UNIVERSITIES CONFERENCE ON ENGINEERING & TECHNOLOGY 2012 (MUCET 2012), 2013, 53 : 645 - 649
  • [8] Optimize LNG boil-off gas systems for regasification terminals
    Zolfkhani, M.
    [J]. HYDROCARBON PROCESSING, 2013, 92 (01): : 37 - 39
  • [9] GAS-TURBINE PACKAGE ELIMINATES LNG BOIL-OFF
    STENGEL, RF
    [J]. DESIGN NEWS, 1973, 28 (19) : 86 - 87
  • [10] Utilization of Engine Exhaust Gas in Boil-off Gas Reliquefaction System of a LNG Carrier Ship
    Kochunni, Sarun Kumar
    Chowdhury, Kanchan
    [J]. 15TH CRYOGENICS 2019 IIR INTERNATIONAL CONFERENCE, 2019, : 254 - 261