Technical requirements and design of RF power source for BEPC II

被引:0
|
作者
Pan, WM [1 ]
Zhao, GY [1 ]
Wang, H [1 ]
Wang, GW [1 ]
机构
[1] Chinese Acad Sci, Inst High Energy Phys, Beijing 100049, Peoples R China
关键词
BEPC II RF power source; technical design and parameters; layout;
D O I
暂无
中图分类号
O57 [原子核物理学、高能物理学];
学科分类号
070202 ;
摘要
For the sake of acquiring the shorter beam bunch length a 500MHz RF system will be adopted in Beijing Electron-Positron Collider Upgrade (BEPCII) project to replace the existing 200MHz RF system. The designed beam current of BEPCII is 0.91A which put forward high requirements to the parameters of RF power source. According to the BEPCII general goals and the related requirements with RF system we completed the BEPCII RF power source layout and all technical designs including the parameters for the transmitters and the circulators, completed the designs of all auxiliary systems. Based on these designs, the first BEPCII RF power source including the transmitter and the circulator as well as the auxiliary systems have been established and passed the acceptance test.
引用
收藏
页码:246 / 250
页数:5
相关论文
empty
未找到相关数据