Sustainable workforce scheduling in construction program management

被引:21
|
作者
Florez, L. [1 ]
Castro-Lacouture, D. [1 ]
Medaglia, A. L. [2 ]
机构
[1] Georgia Inst Technol, Atlanta, GA 30332 USA
[2] Univ Los Andes, Bogota, Colombia
关键词
construction; project management; integer programming; scheduling; PERFORMANCE; INDICATORS; PROJECTS;
D O I
10.1057/jors.2012.164
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The multimode resource-constrained project scheduling problem (MRCPSP) deals with the scheduling of a set of projects with alternative requirements of renewable and non-renewable resources. Solutions to the MRCPSP usually consider objectives in terms of cost and time. However, social objectives related with the workforce may impact the performance of projects and affect program sustainability goals. To account for this new social input, this paper extends the MRCPSP and proposes a new multiobjective mixed-integer programming model. The proposed solution method uses an a priori lexicographic ordering of the objectives, followed by an epsilon-constraints approach. The model is illustrated with a case study of a construction program.
引用
收藏
页码:1169 / 1181
页数:13
相关论文
共 50 条
  • [1] A New Sustainable Warehouse Management Approach for Workforce and Activities Scheduling
    Popovic, Vlado
    Kilibarda, Milorad
    Andrejic, Milan
    Jereb, Borut
    Dragan, Dejan
    [J]. SUSTAINABILITY, 2021, 13 (04) : 1 - 19
  • [2] Building a Sustainable Construction Workforce
    Sokas, Rosemary K.
    Dong, Xiuwen Sue
    Cain, Chris Trahan
    [J]. INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2019, 16 (21)
  • [3] Sustainable Program Quality Management of International Infrastructure Construction
    Wang, Steve Hsueh-Ming
    [J]. FRONTIERS OF ENGINEERING MANAGEMENT, 2016, 3 (03) : 239 - 245
  • [4] Sustainable Program Quality Management of International Infrastructure Construction
    Steve Hsueh-Ming Wang
    [J]. Frontiers of Engineering Management, 2016, (03) : 239 - 245
  • [5] Sustainable Program Quality Management of International Infrastructure Construction
    Steve Hsueh-Ming Wang
    [J]. Frontiers of Engineering Management, 2016, 3 (03) : 239 - 245+297
  • [6] Modelling Sustainable Construction Workforce Management Practice and Job Satisfaction in Construction Firms in Lagos State
    Lekan, Amusan
    Olabosipo, Fagbenle
    Timothy, Mosaku
    Charles, Ayo
    Dele, Owolabi
    Ignatious, Omuh
    Patricia, Tunji-Olayeni
    Ayodeji, Ogunde
    Joy, Peter
    [J]. VISION 2020: SUSTAINABLE GROWTH, ECONOMIC DEVELOPMENT, AND GLOBAL COMPETITIVENESS, VOLS 1-5, 2014, : 3093 - 3114
  • [7] A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling
    Dasovic, Borna
    Galic, Mario
    Klansek, Uros
    [J]. SUSTAINABILITY, 2020, 12 (08)
  • [8] Integration of Mixed-Integer Nonlinear Program and Project Management Tool to Support Sustainable Cost-Optimal Construction Scheduling
    Dasovic, Borna
    Klansek, Uros
    [J]. SUSTAINABILITY, 2021, 13 (21)
  • [9] Shift Scheduling for the Effective Management of the Ageing Workforce
    Chatzikonstantinou, Ioannis
    Papaprodromou, Aris
    Loeck, Maria
    Carreton, Rosa
    Segkouli, Sofia
    Triantafyllidis, Andreas
    Giakoumis, Dimitrios
    Votis, Konstantinos
    Tzovaras, Dimitrios
    [J]. UNIVERSAL ACCESS IN HUMAN-COMPUTER INTERACTION: NOVEL DESIGN APPROACHES AND TECHNOLOGIES, UAHCI 2022, PT I, 2022, 13308 : 229 - 241
  • [10] Workforce Management and Scheduling Under Flexible Demand
    Villarreal, Monica C.
    Goldsman, David
    Keskinocak, Pinar
    [J]. SERVICE SCIENCE, 2015, 7 (04) : 331 - 351