Increase the efficiency of an FMS by improving the tool scheduling strategies

被引:9
|
作者
Li, XN [1 ]
Cheung, EHM [1 ]
Chuah, KB [1 ]
机构
[1] CITY UNIV HONG KONG,DEPT MFG ENGN,KOWLOON,HONG KONG
关键词
Flexible Manufacturing System; scheduling; scheduling rules; tool loading; simulation;
D O I
10.1016/0924-0136(96)02489-2
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Tool exchange is an important task in actual operation of a flexible manufacturing system, especially in the case of limited tool capacity of the central tool magazine in an FMS and the local tool magazine on a machining centre. Effective scheduling strategy or rules for tool transportation will increase the utilization of a machining centre, as well as the overall efficiency of an FMS. In this paper, we introduce our research work for improving the scheduling strategies for tool exchange to increase the efficiency of an FMS. At the initial operation of an FMS, a simple scheduling rule combination for tool exchange, called ATE and RSTH is used. In the actual evaluation of the operation of the FMS, its efficiency is found to be very low and the utilization of the machining centre is below 70%. Simulation and analysis for the FMS are made and a new scheduling strategy combination called STE and WPN is tested. Results indicate that the utilization of the machining centre has been increased to about 75%. This new scheduling strategy has increased the operation efficiency of an FMS.
引用
收藏
页码:213 / 218
页数:6
相关论文
共 50 条
  • [1] Modular tool for FMS scheduling
    LGP/ENIT, Tarbes, France
    [J]. Proc IEEE Int Symp Assem Task Plan, (430-435):
  • [2] WORK SCHEDULING IN FMS UNDER TOOL AVAILABILITY CONSTRAINTS
    CARRIE, AS
    PERERA, DTS
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (06) : 1299 - 1308
  • [3] Research on Modeling and Simulation of Scheduling with Tool Failure in FMS
    Zhao Dan
    Zhang Jia-tai
    Li Ling-li
    [J]. ADVANCED DESIGN AND MANUFACTURE II, 2010, 419-420 : 101 - +
  • [4] General heuristic procedures and solution strategies for FMS scheduling
    Liu, J
    MacCarthy, BL
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (14) : 3305 - 3333
  • [5] Strategies and fundamental structures for FMS tool flow systems
    Silva, SC
    [J]. RE-ENGINEERING FOR SUSTAINABLE INDUSTRIAL PRODUCTION, 1997, : 196 - 204
  • [6] Constraint programming approach to tool allocation and resource scheduling in FMS
    Quiroga, O
    Zeballos, L
    Henning, G
    [J]. 2005 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION (ICRA), VOLS 1-4, 2005, : 3715 - 3720
  • [7] Minimizing maximum tardiness in single FMS machine scheduling with tool changes
    Lin, Kai-Yung
    Chung, Yu-Ko
    [J]. JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES, 2009, 30 (06): : 1177 - 1196
  • [8] FMS TOOL SUPPLY IN A STOCHASTIC ENVIRONMENT - STRATEGIES AND RELATED RELIABILITIES
    ZAVANELLA, L
    MACCARINI, GC
    BUGINI, A
    [J]. INTERNATIONAL JOURNAL OF MACHINE TOOLS & MANUFACTURE, 1990, 30 (03): : 389 - 402
  • [9] An FMS Dynamic Production Scheduling Algorithm Considering Cutting Tool Failure and Cutting Tool Life
    Setiawan, A.
    Wangsaputra, R.
    Martawirya, Y. Y.
    Halim, A. H.
    [J]. 2ND INTERNATIONAL MANUFACTURING ENGINEERING CONFERENCE AND 3RD ASIA-PACIFIC CONFERENCE ON MANUFACTURING SYSTEMS (IMEC-APCOMS 2015), 2016, 114
  • [10] PLANNING AND SCHEDULING IN AN FMS
    AANEN, E
    GAALMAN, GJ
    NAWIJN, WM
    [J]. ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 17 (1-4): : 89 - 97