A Generalized Algorithm for Solving Multicriteria Scheduling Problems

被引:1
|
作者
Oyetunji, E. O. [1 ]
Oluleye, A. E. [1 ]
机构
[1] Univ Dev Studies, Dept Comp Sci, Tamale, Ghana
关键词
Scheduling; Multicriteria; Algorithm; relative weights; Optimization; Scalar function; TOTAL COMPLETION-TIME; SINGLE-MACHINE; RELEASE TIME; HEURISTICS;
D O I
10.4028/www.scientific.net/AMR.367.653
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
In this paper, the scheduling problem involving optimization of multiple criteria (or objectives) is explored. There are many variants of the problem. The particular variant, in which the objectives are aggregated into a scalar function (with each criterion having weight which denotes its relative importance), is considered. An algorithm which can be used to solve very large classes of the multicriteria scheduling problem is proposed. The proposed algorithm and two solution methods selected from the literature were evaluated on a total of 900 randomly generated multicriteria scheduling problems (ranging from 10 to 500 jobs). Two variants of the release dates (0 - 24 and 0 - 49) are utilized. Results show that the proposed algorithm performed better than the selected solution methods when the total completion time criterion is much more important than the other criteria. However, when the total completion time criterion is much less important than the other criteria, the selected solution methods outperformed the proposed algorithm. The results are consistent under the two variants of the release dates.
引用
收藏
页码:653 / 666
页数:14
相关论文
共 50 条
  • [1] AN ALGORITHM FOR SOLVING DYNAMIC SCHEDULING PROBLEMS
    SOUBRIER, JP
    [J]. RAIRO-RECHERCHE OPERATIONNELLE-OPERATIONS RESEARCH, 1982, 16 (03): : 219 - 239
  • [2] On the Reducibility of Multicriteria Scheduling Problems to Bicriteria Scheduling Problems
    Akande, Saheed
    Oluleye, Ayodeji. E.
    Oyetunji, Elkanah O.
    [J]. 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
  • [3] A tabu search algorithm for solving a multicriteria flexible job shop scheduling problem
    Vilcot, Geoffrey
    Billaut, Jean-Charles
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (23) : 6963 - 6980
  • [4] Multicriteria scheduling problems: A survey
    T'kindt, V
    Billaut, JC
    [J]. RAIRO-RECHERCHE OPERATIONNELLE-OPERATIONS RESEARCH, 2001, 35 (02): : 143 - 163
  • [5] Solving the job shop scheduling problems by an immune algorithm
    Zuo, XQ
    Fan, YS
    [J]. PROCEEDINGS OF 2005 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-9, 2005, : 3282 - 3287
  • [6] Solving project scheduling problems with a heuristic learning algorithm
    Zamani, R
    Shue, LY
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (07) : 709 - 716
  • [7] Rolling Operation Algorithm for Solving Complex Scheduling Problems
    Czuczai, Barbara
    Farkas, Tivadar
    Rev, Endre
    Lelkes, Zoltan
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2009, 48 (08) : 3898 - 3908
  • [8] Search method for solving multicriteria scheduling problem
    Abbas, Doha Adel
    [J]. INTERNATIONAL JOURNAL OF NONLINEAR ANALYSIS AND APPLICATIONS, 2022, 13 (01): : 1709 - 1720
  • [9] A GENERALIZED MEAN PROXIMAL ALGORITHM FOR SOLVING GENERALIZED MIXED EQUILIBRIUM PROBLEMS
    Saddeek, A. M.
    [J]. BULLETIN OF MATHEMATICAL ANALYSIS AND APPLICATIONS, 2015, 7 (01): : 1 - 11
  • [10] An Iterative Algorithm for Solving Generalized Equilibrium Problems and Fixed Points Problems
    Li, Mengqin
    Yao, Yonghong
    Liou, Yeong-Cheng
    [J]. INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION, VOL 2, PROCEEDINGS, 2009, : 792 - +