Multitasking scheduling problems with a rate-modifying activity

被引:47
|
作者
Zhu, Zhanguo [1 ,2 ]
Zheng, Feifeng [4 ]
Chu, Chengbin [3 ]
机构
[1] Nanjing Agr Univ, Coll Econ & Management, Nanjing, Jiangsu, Peoples R China
[2] Univ Evry Val dEssonne, Lab Informat Biol Integrat & Syst Complexes IBISC, EA 4526, Evry, France
[3] Ecole Cent Paris, Lab Genie Ind, Chatenay Malabry, France
[4] Donghua Univ, Glorious Sun Sch Business & Management, Shanghai, Peoples R China
关键词
scheduling; optimization; algorithms; multitasking; rate-modifying activity; DUE-DATE ASSIGNMENT; SINGLE-MACHINE SUBJECT; MAINTENANCE ACTIVITY; DETERIORATING MAINTENANCE; WINDOW ASSIGNMENT; TIME; INTERRUPTIONS; ALLOCATION;
D O I
10.1080/00207543.2016.1208852
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Motivated by the behavioral phenomena that occur while human operators are carrying out tasks, we study multitasking scheduling problemswith a rate-modifying activity. In the problems, the processing of a selected task suffers from interruptions by other tasks that are available but unfinished, and the human operators regularly engage rest breaks during work shifts allowing them to recover or mitigate some of the negative effects of fatigue. The objectives are to respectively minimize: makespan, total completion time, maximum lateness, and due-date assignment related cost by determining when to schedule the rate modifying activity and the optimal task sequence in the presence of multitasking. Scheduling models and algorithms are proposed to solve the problems. The numerical examples are presented to illustrate the theorems and algorithms.