Vacuum sewer design, construction and operation in rural Alaska

被引:0
|
作者
Schubert, D [1 ]
Costello, P [1 ]
Heintzman, T [1 ]
Lohr, E [1 ]
机构
[1] US PHS, Tech Serv Branch, ANTHC, Dept Environm Hlth & Engn, Anchorage, AK 99508 USA
关键词
vacuum sewers; arctic pipe; Alaska; cold climate; pipelines; wastewater; vacuum pumps; freeze; heat loss;
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Vacuum sewer collection systems have proven to be a practical and cost effective means of wastewater colleciton when the local topography is flat and thaw unstable ground prohibits buried utilities. There are 10 vacuum collection systems currently in operation or under construction in rural Alaska. This paper provides a brief overview of cold regions factors associated with the design and construction of vacuum sewers. The recent $12.9 million (US) combined vacuum sewer with circulating water distribution system in Savoonga, Alaska is described.
引用
收藏
页码:369 / 376
页数:8
相关论文
共 50 条
  • [1] DESIGN, CONSTRUCTION, AND OPERATION OF SEWER OUTFALLS IN ESTUARINE AND TIDAL WATERS
    HEANEY, FL
    JOURNAL WATER POLLUTION CONTROL FEDERATION, 1960, 32 (06): : 610 - 621
  • [2] Design and construction of arctic water distribution systems in rural Alaska
    Reitz, DD
    Schubert, DH
    Wagner, DJ
    COLD REGIONS ENGINEERING: PUTTING RESEARCH INTO PRACTICE, 1999, : 285 - 296
  • [3] Design and construction of water storage tanks on warm permafrost in rural Alaska
    Schubert, Daniel H.
    Reitz, Daniel D.
    Proceedings of the International Conference on Cold Regions Engineering, 1999, : 255 - 266
  • [4] Design and construction of water storage tanks on warm permafrost in rural Alaska
    Schubert, DH
    Reitz, DD
    COLD REGIONS ENGINEERING: PUTTING RESEARCH INTO PRACTICE, 1999, : 255 - 266
  • [5] DESIGN AND CONSTRUCTION OF A LARGE INTERCEPTING SEWER
    RICE, LG
    AUFFANT, EJ
    SEWAGE AND INDUSTRIAL WASTES, 1956, 28 (07): : 841 - 851
  • [6] ADITYA upgrade vacuum vessel: Design, construction, testing, installation and operation
    Jadeja, K. A.
    Bhatt, S. B.
    Rathod, Kulav
    Patel, K. M.
    Prajapati, V. R.
    Acharya, K. S.
    Patel, N. D.
    Tanna, R. L.
    Kalal, M. B.
    Ghosh, J.
    Chattopadhyay, P. K.
    Saxena, Y. C.
    Das, A.
    Bora, D.
    FUSION ENGINEERING AND DESIGN, 2017, 124 : 558 - 561
  • [7] TRANS-ALASKA PIPELINE - PROBLEMATICS, CONSTRUCTION AND OPERATION
    STOLL, RD
    KLEINEARNDT, M
    ERDOL & KOHLE ERDGAS PETROCHEMIE, 1981, 34 (06): : 242 - 250
  • [8] Vacuum system design, construction, and operation for the Cornell High Energy Synchrotron Source upgrade
    Lushtak, Yevgeniy
    Burke, David
    Li, Yulin
    Lyndaker, Aaron
    Liu, Xianghong
    Ying, Laurel
    VACUUM, 2021, 186
  • [9] Vacuum system design, construction, and operation for the Cornell High Energy Synchrotron Source upgrade
    Lushtak, Yevgeniy
    Burke, David
    Li, Yulin
    Lyndaker, Aaron
    Liu, Xianghong
    Ying, Laurel
    Lushtak, Yevgeniy (yl622@cornell.edu), 2021, Elsevier Ltd (186)
  • [10] Experiences from construction and operation of OP cable plants in sewer systems
    Liese, W
    Pastuszka, S
    EUROCABLE, 2000, : 26 - 35