Success probability orientated optimization model for resource allocation of the technological innovation multi-project system

被引:1
|
作者
Dai, Weixu [1 ,2 ]
Wu, Weiwei [1 ]
Yu, Bo [1 ]
Zhu, Yunhao [1 ]
机构
[1] Harbin Inst Technol, Sch Management, Harbin 150001, Peoples R China
[2] China Acad Space Technol, Inst Spacecraft Syst Engn, Beijing 100094, Peoples R China
基金
美国国家科学基金会; 中国国家自然科学基金;
关键词
technological innovation; multi-project system; resource allocation; success probability; PROGRAM MANAGEMENT; ALGORITHM;
D O I
10.21629/JSEE.2016.06.11
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A success probability orientated optimization model for resource allocation of the technological innovation multi-project system is studied. Based on the definition of the technological innovation multi-project system, the leveling optimization of cost and success probability is set as the objective of resource allocation. The cost function and the probability function of the optimization model are constructed. Then the objective function of the model is constructed and the solving process is explained. The model is applied to the resource allocation of an enterprise's technological innovation multi-project system. The results show that the proposed model is more effective in rational resource allocation, and is more applicable in maximizing the utility of the technological innovation multi-project system.
引用
收藏
页码:1227 / 1237
页数:11
相关论文
共 50 条
  • [1] Success probability orientated optimization model for resource allocation of the technological innovation multi-project system
    Weixu Dai
    Weiwei Wu
    Bo Yu
    Yunhao Zhu
    [J]. Journal of Systems Engineering and Electronics, 2016, 27 (06) : 1227 - 1237
  • [2] A Model-Based Hybrid System for Human Resource Allocation in Multi-Project Management
    Khatun, Mst Taskia
    Hiekata, Kazuo
    [J]. TRANSDISCIPLINARITY AND THE FUTURE OF ENGINEERING, 2022, 28 : 586 - 595
  • [3] Multi-dimensional Model Method for the Human Resource Allocation in Multi-project
    Chen Junjie
    Yun Chuxiu
    Wang Zhen
    [J]. 2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 4, PROCEEDINGS, 2009, : 364 - +
  • [4] A dynamic model of resource allocation in multi-project research and development systems
    Repenning, NP
    [J]. SYSTEM DYNAMICS REVIEW, 2000, 16 (03) : 173 - 212
  • [5] Research on Multi-project Resource Allocation Process and Application
    Zhang, Xinli
    Li, Jie
    Zhu, Yanfang
    [J]. ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2267 - 2272
  • [6] Construction Multi-Project Scheduling Model Considering Different Resource Allocation Behavior
    Liu, Shu-Shun
    Chen, Wei Tong
    [J]. ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2815 - +
  • [7] A heuristic method for resource constrained allocation in multi-project scheduling
    Ghomi, SMTF
    Ashjari, B
    [J]. IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY, 2002, 26 (B1): : 111 - 116
  • [8] Multi-project resource allocation under uncertainty: a concept of using resource buffers
    Khatun, Taskia
    Hiekata, Kazuo
    Nakashima, Takuya
    [J]. Journal of Advanced Mechanical Design, Systems and Manufacturing, 2024, 18 (07)
  • [9] Multi-project Flexible Resource Profiles Project Scheduling with Ant Colony Optimization
    Rokou, E.
    Dermitzakis, M.
    Kirytopoulos, K.
    [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 642 - 646
  • [10] Resource Allocation in Multi-Project Environments: Planning vs. Execution Strategies
    Ben-Zvi, Tal
    Lechler, Thomas G.
    [J]. 2011 PROCEEDINGS OF PICMET 11: TECHNOLOGY MANAGEMENT IN THE ENERGY-SMART WORLD (PICMET), 2011,