Agricultural farming planning and water resources management under fuzzy uncertainty

被引:12
|
作者
Xu, Y. [1 ]
Huang, G. H. [1 ,2 ]
Shao, L. G. [3 ]
机构
[1] North China Elect Power Univ, Sino Canada Resources & Environm Res Acad, MOE Key Lab Reg Energy & Environm Syst Optimizat, Beijing, Peoples R China
[2] Univ Regina, Fac Engn & Appl Sci, Regina, SK S4S 0A2, Canada
[3] Planning Res Inst, China Ctr Informat Ind Dev, Beijing, Peoples R China
关键词
fuzzy programming; fuzzy ranking; farm planning; water resources management; uncertainty; QUALITY MANAGEMENT; AIR-QUALITY; OPTIMIZATION; MODELS;
D O I
10.1080/0305215X.2013.768239
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, a rank-based fuzzy optimization (RBFO) approach was provided for supporting agricultural farming planning under complex uncertainties. RBFO was built by linking feasibility-degree-based fuzzy programming with fuzzy ranking. First, the model was solved under different levels of violation risks to environmental or capacity constraints, leading to a group of cost-effective solutions; then, the ranking technique was used to help identify the most desirable solution from different alternatives, based on the trade-off analysis between the system benefit and risk. A farm planning case with water resources management consideration was used to demonstrate the applicability of RBFO. The study results indicate that the provided systems analysis approach could help decision makers to gain a deep insight into the complex interrelationships among agricultural economic development, pollution control and water resources conservation in a farm planning system, and to seek cost-effective production patterns with favourable deliberation of various factors.
引用
收藏
页码:270 / 288
页数:19
相关论文
共 50 条
  • [1] Regional agricultural water resources management with respect to fuzzy return and energy constraint under uncertainty: An integrated optimization approach
    Luo, Zhiwei
    Xie, Yulei
    Ji, Ling
    Cai, Yanpeng
    Yang, Zhifeng
    Huang, Guohe
    [J]. JOURNAL OF CONTAMINANT HYDROLOGY, 2021, 242
  • [2] MULTIOBJECTIVE WATER-RESOURCES INVESTMENT PLANNING UNDER BUDGETARY UNCERTAINTY AND FUZZY ENVIRONMENT
    SUTARDI
    BECTOR, CR
    GOULTER, I
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 82 (03) : 556 - 591
  • [3] A model of crop planning under uncertainty in agricultural management
    Itoh, T
    Ishii, H
    Nanseki, T
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 81-2 : 555 - 558
  • [4] Risk, Robustness and Water Resources Planning Under Uncertainty
    Borgomeo, Edoardo
    Mortazavi-Naeini, Mohammad
    Hall, Jim W.
    Guillod, Benoit P.
    [J]. EARTHS FUTURE, 2018, 6 (03): : 468 - 487
  • [5] Sustainable water resources management under uncertainty
    Chang, NB
    [J]. STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2005, 19 (02) : 97 - 98
  • [6] Sustainable water resources management under uncertainty
    Ni-Bin Chang
    [J]. Stochastic Environmental Research and Risk Assessment, 2005, 19 : 97 - 98
  • [7] IFMP: Interval-fuzzy multistage programming for water resources management under uncertainty
    Li, Y. P.
    Huang, G. H.
    Yang, Z. F.
    Nie, S. L.
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2008, 52 (05) : 800 - 812
  • [8] PLANNING AGRICULTURAL WATER RESOURCES SYSTEM ASSOCIATED WITH FUZZY AND RANDOM FEATURES
    Li, Y. P.
    Huang, G. H.
    [J]. JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION, 2011, 47 (04): : 841 - 860
  • [9] Integrated planning for regional development planning and water resources management under uncertainty: A case study of Xining, China
    Fu, Z. H.
    Zhao, H. J.
    Wang, H.
    Lu, W. T.
    Wang, J.
    Guo, H. C.
    [J]. JOURNAL OF HYDROLOGY, 2017, 554 : 623 - 634
  • [10] An inexact two-stage water management model for planning agricultural irrigation under uncertainty
    Li, W.
    Li, Y. P.
    Li, C. H.
    Huang, G. H.
    [J]. AGRICULTURAL WATER MANAGEMENT, 2010, 97 (11) : 1905 - 1914