Ex post evaluation of PPP government-led renegotiations: Impacts on the financing of road infrastructure

被引:13
|
作者
Fernandes, Carlos [1 ]
Cruz, Carlos Oliveira [2 ]
Moura, Filipe [2 ]
机构
[1] Inst Super Tecn, Lisbon, Portugal
[2] Univ Lisbon, Inst Super Tecn, CERIS, Lisbon, Portugal
来源
ENGINEERING ECONOMIST | 2019年 / 64卷 / 02期
关键词
PRIVATE FINANCE; TOLL; PROJECTS; UK; ELASTICITIES; CONTRACTS; SPAIN; COST;
D O I
10.1080/0013791X.2018.1559384
中图分类号
F [经济];
学科分类号
02 ;
摘要
Renegotiations are often claimed to be the major pitfall in public-private partnership projects. In fact, the literature and empirical evidence suggest a bias toward favoring concessionaires, although there are well-known examples of harmful unilateral decisions by governments. This article establishes a distinction between structural renegotiations (with changes in the risk-sharing agreement) and nonstructural renegotiations (without shifting risk) and analyzes the implications of structural renegotiations in a road concession by comparing the ex ante and ex post financial implications for government, concessionaire, and users. The selected project is one that started as a shadow toll and was later changed to real toll. The analysis shows that the renegotiation essentially transferred costs to the users. The financial burden for the government decreased and the internal rate of return (IRR) of the concessionaire increased slightly although the overall risk profile of the concession decreased. The users supported a 40% higher cost, and the system gained an additional cost component (the electronic tolling system). Overall the global financial costs increased 40% when compared with the initial regime. The article also sets out some discussions and implications for policymakers.
引用
收藏
页码:116 / 141
页数:26
相关论文
共 32 条
  • [1] Government-led critical success factors in PPP infrastructure development
    Wibowo, Andreas
    Alfen, Hans Wilhelm
    [J]. BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2015, 5 (01) : 121 - 134
  • [2] Government-led rural Infrastructure PPP Project Risk Allocation
    Xiao, Xia
    Ao, Hui
    [J]. PROCEEDINGS OF THE FIRST INTERNATIONAL SYMPOSIUM ON MANAGEMENT AND SOCIAL SCIENCES (ISMSS 2019), 2019, 309 : 180 - 185
  • [3] Concessions of infrastructure in Latin America: Government-led renegotiation
    Guasch, J. Luis
    Laffont, Jean-Jacques
    Straub, Stephane
    [J]. JOURNAL OF APPLIED ECONOMETRICS, 2007, 22 (07) : 1267 - 1294
  • [4] Government-Led Factors Affecting the Financing of PFI Projects in Malaysia
    Lasa, Yati Md
    Ahmad, Norizan
    Takim, Roshana
    [J]. ADVANCED SCIENCE LETTERS, 2017, 23 (09) : 8236 - 8242
  • [5] A sustainability evaluation of government-led urban renewal projects
    Lee, Grace
    Chan, Edwin
    [J]. FACILITIES, 2008, 26 (13-14) : 526 - 541
  • [6] Prefigurative Post-Politics as Strategy: The Case of Government-Led Blockchain Projects
    Husain, Syed Omer
    Roep, Dirk
    Franklin, Alex
    [J]. JOURNAL OF THE BRITISH BLOCKCHAIN ASSOCIATION, 2020, 3 (01): : 16 - 22
  • [7] Ex-post impact evaluation of PPP projects from multiple stakeholder perspectives: a toll road case
    Oliveros-Romero, Jose
    Aibinu, Ajibade A.
    [J]. BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2023, 13 (04) : 574 - 589
  • [8] The Government-led initiative for LPG scale-up in Cameroon: Programme development and initial evaluation
    Bruce, Nigel
    de Cuevas, Rachel Anderson
    Cooper, Jessie
    Enonchong, Bessem
    Ronzi, Sara
    Puzzolo, Elisa
    MBatchou, Bertrand
    Pope, Daniel
    [J]. ENERGY FOR SUSTAINABLE DEVELOPMENT, 2018, 46 : 103 - 110
  • [9] 'Urban entrepreneurialism' in the Post-socialist City: Government-led Urban Development Projects in Kazan, Russia
    Kinossian, Nadir
    [J]. INTERNATIONAL PLANNING STUDIES, 2012, 17 (04) : 333 - 352
  • [10] Ex post impact evaluation of PPP projects: an exploratory research
    Oliveros-Romero, Jose
    Aibinu, Ajibade A.
    [J]. BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2019, 9 (02) : 315 - 330