Bayonne Bridge Segmental Approaches in Construction Engineering

被引:0
|
作者
Despradel, Shukre J. [1 ]
Eggers, Walter K. [1 ]
机构
[1] Kiewit Engn Grp KEG, Englewood, CO 80112 USA
来源
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Bayonne Bridge, which spans the Kill van Kull Channel connecting Staten Island, New York, and the city of Bayonne, New Jersey, was opened for traffic in 1931. When opened it was the longest arch span in the world with a main span of 1,675 feet, a total length of 5,789 feet, and a mid-span vertical clearance of 150 feet. In the early 2000s, the owner of the bridge, The Port Authority of NY and NJ, decided to raise the bridge deck of the arch to provide a minimum clearance of 215 ft and build new, taller approaches. The new navigation clearance allows neopanamax ships access to the port of Newark. The new approaches are precast-segmental built with the balanced-cantilever method using an overhead gantry. The crowded urban site required construction over residences and active businesses within the footprint of the existing bridge without major traffic interruptions. Consequently, permanent works, temporary works, and construction staging were constrained by the existing bridge. This paper presents an overview (from the independent checker's perspective) of the construction engineering required to accomplish this task.
引用
收藏
页码:230 / 238
页数:9
相关论文
共 50 条
  • [1] 'CROSSING THE BAYONNE BRIDGE'
    SMITS, R
    [J]. RELIGIOUS HUMANISM, 1989, 23 (02) : 74 - 74
  • [2] BAYONNE RIVER BRIDGE
    BOURGEOI.C
    [J]. CIVIL ENGINEERING, 1969, 39 (06): : 43 - &
  • [3] SEGMENTAL BRIDGE CONSTRUCTION - THE WAVE OF THE FUTURE
    WILKES, WJ
    [J]. JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1980, 25 (05): : 24 - 30
  • [4] STATUS OF SEGMENTAL BRIDGE CONSTRUCTION IN EUROPE
    MATT, P
    [J]. JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1983, 28 (03): : 104 - 125
  • [5] Accelerated bridge construction using precast segmental bridge piers
    Ranasinghe, A. P.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION, 2014, : 1565 - 1569
  • [6] SEGMENTAL BRIDGE CONSTRUCTION IN FLORIDA - A REVIEW AND PERSPECTIVE
    MORETON, AJ
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1990, 88 : 381 - 419
  • [7] Construction of the concrete segmental Wabasha Street Bridge
    Nelson, KL
    DeHaven, TA
    [J]. 14TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION - PROCEEDINGS, 1997, : 232 - 237
  • [8] Segmental cantilever bridge construction case study
    Mondorf, PE
    Kuprenas, JA
    Kordahi, EN
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1997, 123 (01): : 79 - 84
  • [9] Precast segmental bridge construction in seismic zones
    Seible, F.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 2 - 16
  • [10] Technologies and developments in precast segmental bridge construction
    Rettinger, Martin
    Hueckler, Alex
    Schlaich, Mike
    [J]. BETON- UND STAHLBETONBAU, 2021, 116 (116) : 12 - 23