Preventive Maintenance and Forced Outages in Power Plants in Korea

被引:6
|
作者
Kim, Tae-Woo [1 ]
Chang, Yenjae [2 ]
Kim, Dae-Wook [3 ]
Kim, Man-Keun [4 ]
机构
[1] Pusan Natl Univ, Sch Mech Engn, Pusan 46241, South Korea
[2] Washington State Univ, Sch Econ Sci, Pullman, WA 99164 USA
[3] Soongsil Univ, Dept Econ, Seoul 06978, South Korea
[4] Utah State Univ, Dept Appl Econ, Logan, UT 84322 USA
关键词
duration of generators; forced outage rate; Korea; preventive maintenance; survival analysis; MODEL; ELECTRICITY; PENETRATION; SYSTEMS; COST; TERM;
D O I
10.3390/en13143571
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Maintaining high facility reliability in power plants is essential to secure long-term electricity supply. This paper applies the survival analysis to theactualunit level power generation data in Korea to estimate the relationship between facility reliability and thepreventivemaintenance. Duration of generators between forced outages is used to measure plant reliability. the empirical analysis shows that preventive maintenance cost, planned outage for maintenance, use rate, and reserve margin lead to the longer duration of generators and, in turn, the lower forced outage rates. We uncover that the marginal benefit of the preventive maintenance cost is decreasing at an increasing rate. It indicates that the marginal benefit of the "current" maintenance cost is minimal. Results in the paper imply that power plants in Korea might be spending unnecessarily high maintenance costs considering already having world's lowest forced outage rates.
引用
收藏
页数:12
相关论文
共 50 条