Parallel-machine scheduling with machine-dependent maintenance periodic recycles

被引:41
|
作者
Li, Guo [1 ]
Liu, Mengqi [2 ]
Sethi, Suresh P. [3 ]
Xu, Dehua [4 ]
机构
[1] Beijing Inst Technol, Sch Management & Econ, Beijing 100081, Peoples R China
[2] Hunan Univ, Sch Business, Changsha 410082, Hunan, Peoples R China
[3] Univ Texas Dallas, Naveen Jindal Sch Management, Dallas, TX 75080 USA
[4] East China Univ Technol, Sch Sci, Nanchang 330013, Jiangxi, Peoples R China
基金
中国国家自然科学基金;
关键词
Scheduling; Maintenance; Periodic recycle; Makespan; Heuristic algorithm; TOTAL FLOW TIME; SINGLE-MACHINE; AVAILABILITY CONSTRAINT; MINIMIZE MAKESPAN; COMPLETION-TIME; JOBS;
D O I
10.1016/j.ijpe.2017.01.014
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Parallel machine structure is very common in modern production systems. Its performance sometimes has a decisive impact on the whole productivity. In this paper, we consider a parallel-machine scheduling problem where each machine is subject to periodic maintenance. Instead of assuming all the machines have the same maintenance periodic cycle, we assume the maintenance periodic cycles are machine-dependent. The objective is to schedule all the jobs to the machines such that the makespan is minimized. We first provide computational complexity and non-approximability analyses of the problem and then present two mathematical programming models to tackle small-sized instances. Thereafter, we present a worst-case analysis of the classical LPT and LS algorithms for the problem. Then we propose two improved heuristic algorithms based on some observations of large-sized instances. In order to evaluate the performance of the heuristic algorithms, we resort to a lower bound of the optimal makespan, and find that it has a very interesting characteristic. Numerical experiments show that the improved heuristic algorithm MLPT improves the objective value of the LPT schedirle by about 6.75% on average and that the MLPT heuristic algorithm has an average-case relative error less than 1.57% for all combinations of instances, which means that it is very suitable for real world applications.
引用
收藏
页码:1 / 7
页数:7
相关论文
共 50 条
  • [1] Multitasking parallel-machine scheduling with machine-dependent slack due-window assignment
    Ji, Min
    Zhang, Wenya
    Liao, Lijuan
    Cheng, T. C. E.
    Tan, Yuanyuan
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (06) : 1667 - 1684
  • [2] A parallel-machine scheduling problem with periodic maintenance under uncertainty
    Jiayu Shen
    Yuanguo Zhu
    [J]. Journal of Ambient Intelligence and Humanized Computing, 2019, 10 : 3171 - 3179
  • [3] A parallel-machine scheduling problem with periodic maintenance under uncertainty
    Shen, Jiayu
    Zhu, Yuanguo
    [J]. JOURNAL OF AMBIENT INTELLIGENCE AND HUMANIZED COMPUTING, 2019, 10 (08) : 3171 - 3179
  • [4] Parallel-machine Scheduling with General Positional Deterioration and Maintenance
    Wang, Shijin
    [J]. 2013 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM 2013), 2013, : 1223 - 1227
  • [5] Parallel machine scheduling of machine-dependent jobs with unit-length
    Lin, YX
    Li, WH
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 156 (01) : 261 - 266
  • [6] A parallel-machine scheduling with periodic constraints under uncertainty
    Shen, Jiayu
    Zhu, Yuanguo
    [J]. ADVANCES IN MECHANICAL ENGINEERING, 2019, 11 (12)
  • [7] Unrelated parallel-machine scheduling with deteriorating maintenance activities
    Cheng, T. C. E.
    Hsu, Chou-Jung
    Yang, Dar-Li
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 60 (04) : 602 - 605
  • [8] Parallel-machine scheduling with maintenance: Praising the assignment problem
    Gara-Ali, Ahmed
    Finke, Gerd
    Espinouse, Marie-Laure
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 252 (01) : 90 - 97
  • [9] Parallel-Machine Scheduling with Delivery Times and Deteriorating Maintenance
    Ma, Wei-Min
    Sun, Li
    Liu, S. C.
    Wu, T. H.
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2015, 32 (04)
  • [10] Scheduling two parallel machines with machine-dependent availabilities
    He, Jie
    Li, Qingguo
    Xu, Dehua
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2016, 72 : 31 - 42