Set-up of a pre-test mock-up experiment in preparation for the HCPB Breeder Unit mock-up experimental campaign

被引:5
|
作者
Hernandez, F. [1 ]
Kolb, M. [2 ]
Ilic, M. [1 ]
Kunze, A. [1 ]
Nemeth, J. [3 ]
von der Weth, A. [1 ]
机构
[1] Karlsruhe Inst Technol, Inst Neutron Phys & Reactor Technol INR, D-76021 Karlsruhe, Germany
[2] Karlsruhe Inst Technol, Inst Appl Mat IAM WPT, D-76021 Karlsruhe, Germany
[3] KFKI Res Inst Particle & Nucl Phys, Budapest, Hungary
关键词
HCPB; Breeder Unit; Test Blanket Module ITER; PREMUX; TEST BLANKET MODULE; THERMOMECHANICAL ANALYSES; PEBBLE BEDS; DESIGN; TBM;
D O I
10.1016/j.fusengdes.2013.02.107
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The complexity of the experimental set-up for testing a full-scaled Breeder Unit (BU) mock-up for the European Helium Cooled Pebble Bed Test Blanket Module (HCPB-TBM) has motivated to build a pre-test mock-up experiment (PREMUX) consisting of a slice of the BU in the Li4SiO4 region. This pre-test aims at verifying the feasibility of the methods to be used for the subsequent testing of the full-scaled BU mock-up. Key parameters needed for the modeling of the breeder material is also to be determined by the Hot Wire Method (HWM). The modeling tools for the thermo-mechanics of the pebble beds and for the mock-up structure are to be calibrated and validated as well. This paper presents the setting-up of PREMUX in the L-STAR/LL facility at the Karlsruhe Institute of Technology. A key requirement of the experiments is to mimic the neutronic volumetric heating. A new heater concept is discussed and compared to several conventional heater configurations with respect to the estimated temperature distribution in the pebble beds. The design and integration of the thermocouple system in the heater matrix and pebble beds is also described, as well as other key aspects of the mock-up (dimensions, layout, cooling system, purge gas line, boundary conditions and integration in the test facility). The adequacy of these methods for the full-scaled BU mock-up is discussed and the next steps that follow PREMUX set-up are shown. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:2378 / 2383
页数:6
相关论文
共 50 条
  • [1] Construction of PREMUX and preliminary experimental results, as preparation for the HCPB breeder unit mock-up testing
    Hernandez, F.
    Kolb, M.
    Annabattula, R.
    v. d. Weth, A.
    [J]. FUSION ENGINEERING AND DESIGN, 2014, 89 (7-8) : 1257 - 1262
  • [2] Experimental test campaign on an ITER divertor mock-up
    Dell'Orco, G
    Malavasi, A
    Merola, M
    Polazzi, G
    Simoncini, M
    Zito, D
    [J]. FUSION ENGINEERING AND DESIGN, 2002, 61-62 : 147 - 151
  • [3] Fluid dynamic and thermal analyses of a HCPB TBM Breeder Unit mock-up
    Hernandez, Francisco
    Cismondi, Fabio
    Kiss, Bela
    [J]. FUSION ENGINEERING AND DESIGN, 2011, 86 (9-11) : 2278 - 2281
  • [4] Sensitivity and uncertainty analyses of the tritium production in the HCPB breeder blanket mock-up experiment
    Leichtle, D.
    Fischer, U.
    Kodeli, I.
    Perel, R. L.
    Angelone, M.
    Batistoni, P.
    Carconi, P.
    Pillon, M.
    Schaefer, I.
    Seidel, K.
    Villari, R.
    Zappa, G.
    [J]. FUSION ENGINEERING AND DESIGN, 2007, 82 (15-24) : 2406 - 2412
  • [5] Neutronics experiment on a helium cooled pebble bed (HCPB) breeder blanket mock-up
    Batistoni, P.
    Angelone, M.
    Bettinali, L.
    Carconi, P.
    Fischer, U.
    Kodeli, I.
    Leichtle, D.
    Ochiai, K.
    Perel, R.
    Pillon, M.
    Schaefer, I.
    Seidel, K.
    Verzilov, Y.
    Villari, R.
    Zappa, G.
    [J]. FUSION ENGINEERING AND DESIGN, 2007, 82 (15-24) : 2095 - 2104
  • [6] Numerical benchmark of SuperMC3.2 with HCPB mock-up experiment
    Li, Bin
    Wu, Bin
    Sun, Guangyao
    Hao, Lijuan
    Yang, Qi
    Wang, Fang
    [J]. FUSION ENGINEERING AND DESIGN, 2019, 147
  • [7] Mock-up centre
    不详
    [J]. AIRCRAFT ENGINEERING AND AEROSPACE TECHNOLOGY, 1998, 70 (06): : 510 - 510
  • [8] Electronic mock-up
    Bradley, AJ
    [J]. GAS TURBINES, 1997, 97 (13): : 17 - 27
  • [9] Memory Mock-Up
    Mills, Tyler
    [J]. SOUTH DAKOTA REVIEW, 2012, 50 : 20 - 22
  • [10] The mock-up of rehearsals
    Perroux, Alain
    [J]. AVANT SCENE OPERA, 2015, (289): : 120 - 120