共 50 条
- [1] Optimization of shoring/reshoring levels in high-rise building construction [J]. ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2018, 10 (01): : 1803 - 1826
- [2] MEASUREMENT OF CONSTRUCTION LABOR PRODUCTIVITY FOR FORMWORK OF THE HIGH-RISE BUILDING PROJECT [J]. JOURNAL OF MECHANICS OF CONTINUA AND MATHEMATICAL SCIENCES, 2019, 14 (02): : 112 - 120
- [4] Decision support model using the AdaBoost algorithm to select formwork systems in high-rise building construction [J]. 25TH INTERNATIONAL SYMPOSIUM ON AUTOMATION AND ROBOTICS IN CONSTRUCTION - ISARC-2008, 2008, : 644 - 649
- [7] Response of high-rise RC building during the 1995 Kobe Earthquake [J]. PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON COMPUTING IN CIVIL AND BUILDING ENGINEERING, VOLS 1-4, 1997, : 1167 - 1172
- [8] Application of multi-criteria analysis in the selection of formwork material for high-rise building construction projects [J]. COGENT ENGINEERING, 2024, 11 (01):
- [9] Field Monitoring of Column Shortenings in a High-Rise Building during Construction [J]. SENSORS, 2013, 13 (11): : 14321 - 14338
- [10] The construction tracing and simulating analysis for high-rise leaning steel building structures [J]. Tall Buildings: From Engineering to Sustainability, 2005, : 403 - 408