Impacts of pit excavation on foundation piles in deep silty soil by centrifugal model tests

被引:0
|
作者
Wang Guo-hui [1 ,2 ,3 ]
Chen Wen-hua [1 ]
Nie Qing-ke [2 ,3 ]
Chen Jun-hong [2 ,3 ]
Fan Hui-hong [2 ]
Zhang Chuan [2 ]
机构
[1] Beijing Jiaotong Univ, Sch Civil Engn, Beijing 100044, Peoples R China
[2] Construct & Geotech Invest Co Ltd, Hebei Res Inst, Shijiazhuang 050227, Hebei, Peoples R China
[3] Res Ctr Geotech Engn Technol Hebei Prov, Shijiazhuang 050227, Hebei, Peoples R China
关键词
deep silty soft soil stratum; foundation pit excavation; centrifugal model test; foundation pile deformation; interaction between piles and soils;
D O I
10.16285/j.rsm.2019.0113
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The foundation pit excavation of a power plant located along the Yangtze River in Jiangsu province is selected to study the interaction mechanism between piles and soils during excavation of foundation pits in deep silty soft soil. Thus an indoor centrifugal model test with the similarity ratio of 1:50 is designed. The influence of foundation pit excavation on existing pile and surrounding soil in deep silty soft soil are analyzed from different aspects including the pile strain, pile displacement, pile top displacement, surface settlement and soil deformation influence range, pile bending moment and pore water pressure. Results from the centrifugal test and the excavation of the foundation pit in situ are compared and analyzed. It shows that when the shear strength of silty soft soil in the upper part of the layered foundation is relatively high, the pile foundation is subjected to a large force and it is prone to the breakage accident during the excavation process. Two extreme values of pile strain occur near the excavation depth and the interface between the silty soil and the underlying soil layer. Due to the influence of the pile, the pore water pressure of the soil near the excavation face changes smoothly, but the pore water pressure of the soil after the pile changes drastically with the excavation. The interaction between piles and soils mainly lasts 48 hours after excavation before the restoration of stability. The test results match with the field measured data, which can provide a reference for the design and construction process of the foundation pit in deep and thick soft soil.
引用
收藏
页码:399 / 407
页数:9
相关论文
共 13 条
  • [1] DU Chen-xiang, 2016, EXPT STUDY DEFORMATI
  • [2] Hu Q, 2008, ROCK SOIL MECH, V29, P1965
  • [3] Li M, 2010, ROCK SOIL MECH, V31, P366
  • [4] [马险峰 MA Xian-feng], 2009, [岩土工程学报, Chinese Journal of Geotechnical Engineering], V31, P1371
  • [5] Nie QK, 2008, ROCK SOIL MECH, V29, P3089
  • [6] NIE Qing-ke, 2008, DESIGN THEORY APPL D
  • [7] [漆泰岳 Qi Taiyue], 2006, [西南交通大学学报, Journal of Southwest Jiaotong University], V41, P184
  • [8] Qian JG, 2014, ROCK SOIL MECH, V35, P1241
  • [9] WANG Guo-hui, 2011, ARCHITECTURE TEC S11, V42, P161
  • [10] [徐前卫 Xu Qianwei], 2009, [土木工程学报, China Civil Engineering Journal], V42, P154