Study on Resource Management for Prefabricated Concrete Building Based on BIM Technology

被引:3
|
作者
Xu Ning [1 ,2 ]
Wang Guangbin [1 ]
机构
[1] Tongji Univ, Econ & Management Sch, Shanghai 200092, Peoples R China
[2] Shanghai Ershiye Construct Co Ltd, Shanghai 201999, Peoples R China
关键词
D O I
10.1051/matecconf/201927505002
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A comparative analysis of resource management elements between PC (Prefabricated Concrete) structure and traditional cast-in-place structure was carried out firstly. Based on BIM (Building Information Modeling) technology, the resource management elements such as labour, materials and machinery for PC building were analyzed detailedly. It was shown that the dynamic and rational allocation of labour in the narrow work plan for PC building can be realized by the labour deployment method proposed in this paper; the adjustment time of the inclined bracing system for PC building can be reduced to a large extent by the this turnover method proposed in this paper; and the problem of arrangement and selection of tower crane for PC building can be solved by the analysis method of tower crane proposed in this paper.
引用
收藏
页数:5
相关论文
共 50 条
  • [1] Intelligent Engineering Management of Prefabricated Building Based on BIM Technology
    Feng, Jing
    Zhang, Zhiying
    Xu, Yuequn
    Zhang, Aiju
    [J]. INFORMATICA-AN INTERNATIONAL JOURNAL OF COMPUTING AND INFORMATICS, 2022, 46 (03): : 411 - 420
  • [2] Intelligent Engineering Management of Prefabricated Building Based on BIM Technology and CAD Graphics
    Li, Linqing
    [J]. Computer-Aided Design and Applications, 2024, 21 (S6): : 107 - 116
  • [3] Safety Risk Management of Prefabricated Building Construction Based on Ontology Technology in the BIM Environment
    Shen, Ye
    Xu, Min
    Lin, Yini
    Cui, Caiyun
    Shi, Xiaobo
    Liu, Yong
    [J]. BUILDINGS, 2022, 12 (06)
  • [4] Design and optimization of prefabricated building system based on BIM technology
    Yanwu Xiao
    Jyoti Bhola
    [J]. International Journal of System Assurance Engineering and Management, 2022, 13 : 111 - 120
  • [5] Design and optimization of prefabricated building system based on BIM technology
    Xiao, Yanwu
    Bhola, Jyoti
    [J]. INTERNATIONAL JOURNAL OF SYSTEM ASSURANCE ENGINEERING AND MANAGEMENT, 2022, 13 (SUPPL 1) : 111 - 120
  • [6] A Quality Management Method for Prefabricated Building Design Based on BIM and VR-Integrated Technology
    Zhou, Min
    Wang, Jiayuan
    Yu, Bo
    Chen, Kunyang
    [J]. APPLIED SCIENCES-BASEL, 2024, 14 (04):
  • [7] Application and development of BIM technology in prefabricated building design
    Zhao, Mingming
    Zhang, Wanlu
    Xing, Hua
    Zhang, Na
    [J]. INTELLIGENT BUILDINGS INTERNATIONAL, 2024,
  • [8] Integrated application of prefabricated building construction information based on BIM and RFID technology
    Wang, Hui
    [J]. JOURNAL OF COMPUTATIONAL METHODS IN SCIENCES AND ENGINEERING, 2023, 23 (03) : 1265 - 1278
  • [9] Wireless management system of prefabricated construction materials based on BIM technology
    Wu, Xinhua
    [J]. EURASIP JOURNAL ON WIRELESS COMMUNICATIONS AND NETWORKING, 2021, 2021 (01)
  • [10] Research on Construction Management Validity of Prefabricated Buildings Based on the BIM Technology
    Zhang, Qian
    [J]. BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2020, 126 : 302 - 302