A stochastic aggregate production planning model in a green supply chain: Considering flexible lead times, nonlinear purchase and shortage cost functions

被引:117
|
作者
Al-e-Hashem, S. M. J. Mirzapour [1 ]
Baboli, A. [2 ]
Sazvar, Z. [2 ,3 ]
机构
[1] EMLYON Business Sch, F-69134 Ecully, Lyon, France
[2] INSA Lyon, DISP Lab, F-69621 Villeurbanne, France
[3] Sharif Univ Technol, Dept Ind Engn, Tehran, Iran
关键词
Supply chain management; Aggregate production planning; Green principles; Quantity discount; Nonlinear shortage cost; Demand uncertainty; GOAL PROGRAMMING APPROACH; GENETIC ALGORITHM; MANAGEMENT; LOGISTICS;
D O I
10.1016/j.ejor.2013.03.033
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper we develop a stochastic programming approach to solve a multi-period multi-product multi-site aggregate production planning problem in a green supply chain for a medium-term planning horizon under the assumption of demand uncertainty. The proposed model has the following features: (i) the majority of supply chain cost parameters are considered; (ii) quantity discounts to encourage the producer to order more from the suppliers in one period, instead of splitting the order into periodical small quantities, are considered; (iii) the interrelationship between lead time and transportation cost is considered, as well as that between lead time and greenhouse gas emission level; (iv) demand uncertainty is assumed to follow a pre-specified distribution function; (v) shortages are penalized by a general multiple breakpoint function, to persuade producers to reduce backorders as much as possible; (vi) some indicators of a green supply chain, such as greenhouse gas emissions and waste management are also incorporated into the model. The proposed model is first a nonlinear mixed integer programming which is converted into a linear one by applying some theoretical and numerical techniques. Due to the convexity of the model, the local solution obtained from linear programming solvers is also the global solution. Finally, a numerical example is presented to demonstrate the validity of the proposed model. (c) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:26 / 41
页数:16
相关论文
共 34 条
  • [1] Optimizing reliability and cost of system for aggregate production planning in a supply chain
    Ramyar, M.
    Mehdizadeh, E.
    Molana, S. M. Hadji
    [J]. SCIENTIA IRANICA, 2017, 24 (06) : 3394 - 3408
  • [2] Robust aggregate production planning in a green supply chain under uncertainty considering reverse logistics: a case study
    Arezoo Entezaminia
    Mahdi Heidari
    Donya Rahmani
    [J]. The International Journal of Advanced Manufacturing Technology, 2017, 90 : 1507 - 1528
  • [3] Robust aggregate production planning in a green supply chain under uncertainty considering reverse logistics: a case study
    Entezaminia, Arezoo
    Heidari, Mahdi
    Rahmani, Donya
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2017, 90 (5-8): : 1507 - 1528
  • [4] Research on supply chain network model considering stochastic transportation lead time
    Li, Mingyu
    [J]. 2ND INTERNATIONAL CONFERENCE ON APPLIED MATHEMATICS, MODELLING, AND INTELLIGENT COMPUTING (CAMMIC 2022), 2022, 12259
  • [5] Fuzzy Control Model and Simulation for Nonlinear Supply Chain System with Lead Times
    Zhang, Songtao
    Hou, Yanting
    Zhang, Siqi
    Zhang, Min
    [J]. COMPLEXITY, 2017,
  • [6] A multi-objective model for multi-product multi-site aggregate production planning in a green supply chain: Considering collection and recycling centers
    Entezaminia, Arezoo
    Heydari, Mandi
    Rahmani, Donya
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2016, 40 : 63 - 75
  • [7] A supply chain model for imperfect production system with stochastic lead time demand
    Mallick, Rabin Kumar
    Manna, Amalesh Kumar
    Mondal, Shyamal Kumar
    [J]. JOURNAL OF MANAGEMENT ANALYTICS, 2018, 5 (04) : 309 - 333
  • [8] DEVELOPING A ROBUST GREEN SUPPLY CHAIN PLANNING OPTIMIZATION MODEL CONSIDERING POTENTIAL RISKS
    Alashhab, Mohamed Sayed
    Mlybari, Ehab A.
    [J]. INTERNATIONAL JOURNAL OF GEOMATE, 2020, 19 (73): : 208 - 215
  • [9] Multi-Objective Supply Chain Inventory Model with Demand Dependent Purchase Cost and Production Rate Dependent Production Cost
    Das, Satya Kumar
    Islam, Sahidul
    [J]. PAKISTAN JOURNAL OF STATISTICS AND OPERATION RESEARCH, 2019, 15 (04) : 831 - 847
  • [10] Tractable supply chain production planning, modeling nonlinear lead time and quality of service constraints
    Anli, Osman Murat
    Caramanis, Michael C.
    Paschalidis, Ioannis Ch.
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2007, 26 (02) : 116 - 134