BEPC II: construction and commissioning

被引:0
|
作者
Zhang Chuang [1 ]
机构
[1] CAS, Inst High Energy Phys, Beijing 100049, Peoples R China
来源
CHINESE PHYSICS C | 2009年 / 33卷
关键词
collider; synchrotron radiation; luminosity; construction; commissioning;
D O I
暂无
中图分类号
O57 [原子核物理学、高能物理学];
学科分类号
070202 ;
摘要
This is a status report of the project on befalf of the BEPC II team. BEPC II is a major upgrade of the BEPC (Beijing Electron-Positron Collider). It is a double-ring e(+)e(-) collider as well as a synchrotron radiation (SR) source with its outer ring, or SR ring. As a collider, BEPC II operates in the beam energy region of 1-2.3 GeV with design luminosity of 1x10(33) cm(-2)s(-1) at 1.89 GeV. As a light source, the SR ring operates at 2.5 GeV and 250 mA. Construction of the project started in the beginning of 2004. Installation of the storage ring components was completed in October 2007. Commissioning is in progress. There are still many issues for further studies before reach to 3x10(32) cm(-2)s(-1)
引用
收藏
页码:60 / 64
页数:5
相关论文
共 50 条
  • [1] BEPCⅡ: construction and commissioning
    张闯
    中国物理C, 2009, (S2) : 60 - 64
  • [2] Construction and commissioning of the first wiggler at BEPC
    Jiyang, Zeng
    Caitu, Shi
    Jian, Sun
    Renhuai, Chen
    Maosan, Liu
    Shaoxing, Chen
    Nuclear Instruments & Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, 1991, 308 (03):
  • [3] BEPC II linac upgrade and beam commissioning
    Wang, SH
    Pei, GX
    Sun, YL
    Chi, YL
    Chen, YW
    Cao, JS
    Kong, XC
    Zhao, FL
    Hou, M
    Deng, BL
    HIGH ENERGY PHYSICS AND NUCLEAR PHYSICS-CHINESE EDITION, 2006, 30 : 150 - 152
  • [4] BEPC II linac beam commissioning and operation
    Wang Shu-Hong
    Pei Guo-Xi
    Chi Yun-Long
    Chen Yan-Wei
    Cao Jian-She
    Kong Xiang-Cheng
    Zhao Feng-Li
    Hou Mi
    Chen Zhi-Bi
    Liu Wei-Bin
    Deng Bing-Lin
    Geng Zhe-Qiao
    Pei Shi-Lun
    Shen Li
    Le Qi
    Ye Qiang
    CHINESE PHYSICS C, 2008, 32 : 215 - 217
  • [5] Beam commissioning of BEPC II injector Linac
    Chen, YW
    Wang, SH
    Pei, GX
    Liu, WB
    Ye, Q
    HIGH ENERGY PHYSICS AND NUCLEAR PHYSICS-CHINESE EDITION, 2006, 30 (06): : 562 - 565
  • [6] CONSTRUCTION AND COMMISSIONING OF THE 1ST WIGGLER AT BEPC
    ZENG, JY
    SHI, CT
    SUN, JA
    CHEN, RH
    LIU, MS
    CHEN, SX
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 1991, 308 (03): : 616 - 620
  • [7] Application of Libera BPM at BEPC II for the early commissioning
    Cao Jian-She
    Ma Li
    Ma Hui-Zhou
    Guo Zhi-Jun
    Lei Ge
    CHINESE PHYSICS C, 2008, 32 : 102 - 104
  • [8] Preliminary commissioning of superconducting magnets and cryogenic system of BEPC II
    Zong, Z. G.
    Liu, L. Q.
    Xu, Q. J.
    Xlong, L. Y.
    Zhang, L.
    Li, S. P.
    He, K.
    INTERNATIONAL JOURNAL OF MODERN PHYSICS B, 2007, 21 (18-19): : 3163 - 3165
  • [9] Construction of the BEPC II RF system
    Wang Guang-Wei
    Sha Peng
    Pan Wei-Min
    Sun Yi
    Li Zhong-Quan
    Liu Rong
    Huang Tong-Ming
    Zeng Ri-Hua
    Zhao Guang-Yuan
    Huang Hong
    Xu Yu-Fen
    Ma Qiang
    Lin Hai-Ying
    Xu Bo
    Wang Qun-Yao
    CHINESE PHYSICS C, 2008, 32 : 169 - 171
  • [10] First superconducting RF system commissioning for BEPC II in China
    Sun Yi
    Wang Guang-Wei
    Pan Wei-Min
    Li Zhong-Quan
    Huang Hong
    Ma Qiang
    Lin Hai-Ying
    Xu Bo
    Wang Qun-Yao
    Li Shao-Peng
    He Kun
    Liu Ya-Ping
    CHINESE PHYSICS C, 2008, 32 : 191 - 193