Scheduling parameters in flexible manufacturing cells

被引:0
|
作者
Slomp, J [1 ]
Gaalman, G [1 ]
机构
[1] Univ Groningen, Fac Management & Org, NL-9700 AV Groningen, Netherlands
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The existence of a well-designed scheduling procedure is a major condition for an effective integration of a flexible manufacturing cell (FMC) in the material flow of a firm. This paper shows the presence and relative importance of three parameter types in the scheduling of operations on a flexible manufacturing cell: workload control parameters, sequencing parameters, and control space parameters. A (full factorial) simulation study is performed in order to study the impact of the scheduling parameters on the performance of the FMC. It is shown that workload control parameters and sequencing parameters are strongly linked to each other. The study, furthermore, indicates how important performance indicators, such as the utilization of the FMC and the average throughput time of order, can be influenced by the scheduling parameters.
引用
收藏
页码:737 / 746
页数:10
相关论文
共 50 条
  • [1] The scheduling function in flexible manufacturing cells
    Blaga, Florin Sandu
    [J]. ANNALS OF DAAAM FOR 2007 & PROCEEDINGS OF THE 18TH INTERNATIONAL DAAAM SYMPOSIUM: INTELLIGENT MANUFACTURING & AUTOMATION: FOCUS ON CREATIVITY, RESPONSIBILITY, AND ETHICS OF ENGINEERS, 2007, : 85 - 86
  • [2] Control and scheduling in flexible manufacturing cells
    Ferrolho, Antonio
    Crisostomo, Manuel
    [J]. 2006 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY, VOLS 1-6, 2006, : 1369 - +
  • [3] SCHEDULING ROBOTS IN FLEXIBLE MANUFACTURING CELLS
    CLAYBOURN, BH
    [J]. CME-CHARTERED MECHANICAL ENGINEER, 1983, 30 (05): : 36 - 40
  • [4] DESIGN OF A SCHEDULING SYSTEM FOR FLEXIBLE MANUFACTURING CELLS
    CHAN, DY
    BEDWORTH, DD
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (11) : 2037 - 2049
  • [5] AN APPROACH TO HIERARCHICAL PLANNING AND SCHEDULING FOR FLEXIBLE MANUFACTURING CELLS
    JUAN, ZL
    QI, WN
    SONG, XJ
    [J]. IFIP TRANSACTIONS B-APPLICATIONS IN TECHNOLOGY, 1992, 1 : 265 - 272
  • [6] Distributed forward checking for scheduling in flexible manufacturing cells
    Vidal, T
    Archimède, B
    Coudert, T
    [J]. ETFA 2001: 8TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 1, PROCEEDINGS, 2001, : 567 - 574
  • [7] Scheduling flexible manufacturing cells using Tabu Search
    Pitts, R. A., Jr.
    Ventura, J. A.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (24) : 6907 - 6928
  • [8] Scheduling flexible manufacturing cells using a token player algorithm
    Julia, S
    [J]. INTELLIGENT MANUFACTURING SYSTEMS 1998 (IMS'98), 1999, : 165 - 170
  • [9] Scheduling and control of Flexible Manufacturing Cells using Genetic Algorithms
    Ferrolho, António
    Crisóstomo, Manuel
    [J]. 2005, WSEAS (04):
  • [10] PRODUCTION SCHEDULING DURING PHASED IMPLEMENTATION OF FLEXIBLE MANUFACTURING CELLS
    CHAKRAVARTY, AK
    SHTUB, A
    [J]. IIE TRANSACTIONS, 1990, 22 (04) : 292 - 299