Conflict resolution-motivated strategy towards integrated construction site layout and material logistics planning: A bi-stakeholder perspective

被引:24
|
作者
Song, Xiaoling [1 ,2 ]
Xu, Jiuping [3 ]
Shen, Charles [2 ]
Pena-Mora, Feniosky [2 ]
机构
[1] Nanjing Univ Sci & Technol, Sch Econ & Management, Dept Management Sci & Engn, Nanjing 210094, Jiangsu, Peoples R China
[2] Columbia Univ, Dept Civil Engn & Engn Mech, Adv ConsTruct & InfOrmat TechNol ACTION Lab, New York, NY 10027 USA
[3] Sichuan Univ, State Key Lab Hydraul & Mt River Engn, Chengdu 610064, Sichuan, Peoples R China
基金
中国国家自然科学基金;
关键词
Bi-stakeholder decision conflict; Site layout; Material logistics plan; Bi-level model; Bi-PSO; FUZZY RANDOM-VARIABLES; TEMPORARY FACILITIES; OPTIMIZATION; SYSTEM; MODEL; ALLOCATION; INVENTORY; GIS;
D O I
10.1016/j.autcon.2017.12.018
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Efficiency of construction site layout planning (CSLP) and construction material logistics planning (CMLP) is of great significance for a successful project control. Despite considerable research undertaken to separately optimize the site layout plan or material logistics plan, the interdependencies and decision conflicts of the layout planner and the logistics planner are neglected in the construction planning and design phase. The ignorance of the decision conflicts and interdependencies can lead to an overrun cost, a delayed project or a worse quality. This research proposes a decentralized methodology based on a bi-level model and a Bi-PSO algorithm, enabling the layout planner and the logistics planner to optimize the CSLP and the CMLP in an integrated model. Fuzzy random parameters are utilized to deal with uncertainty in the data collection process. By utilizing the methodology, the stakeholders are capable of adjusting the respective decisions based on the changes of others. By iteratively adjusting the CSLP and CMLP solutions, the CSLP-CMLP decision conflicts are dealt with, accordingly, the bi-stakeholder conflict resolution-motivated CSLP-CMLP strategy is planned. To demonstrate the applicability of the proposed methodology, a real case study is conducted to optimize CSLP and CMLP simultaneously. The significance of optimizing an integrated CSLP-CMLP for the layout planner, the logistics planner and the general contractor is also justified. The contributions of this research include the capability of modeling the decision conflicts in a bi-level model, the ability of generating an integrated CSLP-CMLP solution and the practicality of guiding academic researchers and practitioners to optimize construction management from a global viewpoint. The research can be extended to other fields to explore the effects of decentralized decision making on other bi-stakeholder conflict resolution cases.
引用
收藏
页码:138 / 157
页数:20
相关论文
共 3 条
  • [1] Bi-stakeholder Conflict Resolution-Based Layout of Construction Temporary Facilities in Large-Scale Construction Projects
    Xiaoling Song
    Zhe Zhang
    Jiuping Xu
    Ziqiang Zeng
    Charles Shen
    Feniosky Peña-Mora
    International Journal of Civil Engineering, 2018, 16 : 941 - 964
  • [2] Bi-stakeholder Conflict Resolution-Based Layout of Construction Temporary Facilities in Large-Scale Construction Projects
    Song, Xiaoling
    Zhang, Zhe
    Xu, Jiuping
    Zeng, Ziqiang
    Shen, Charles
    Pea-Mora, Feniosky
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2018, 16 (8A) : 941 - 964
  • [3] CONFLICT RESOLUTION TOWARDS AN INTEGRATED PROJECT SCHEDULING AND MATERIAL ORDERING SYSTEM IN A LARGE-SCALE CONSTRUCTION PROJECT
    Feng, Cuiying
    Ni, Ting
    Li, Zongmin
    Cai, Jianhu
    Ma, Yanfang
    APPLIED AND COMPUTATIONAL MATHEMATICS, 2019, 18 (02) : 202 - 217