Numerical Simulation of Subway Station Constructed Using Top-down Method

被引:1
|
作者
Wang, Tiecheng [1 ]
Du, Xinghua [2 ]
Zhao, Hailong [1 ]
机构
[1] Tianjin Univ, Key Lab Coast Civil Struct Safety, Sch Civil Engn, Minist Educ, Tianjin 300072, Peoples R China
[2] Tianjin Univ, Sch Civil Engn, Tianjin, Peoples R China
来源
关键词
top-down method; subway station; stress; deformation;
D O I
10.4028/www.scientific.net/AMR.446-449.3757
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper mainly deals with the stress and deformation behavior of the subway station structure during the excavation, the construction of the station constructed using top-down method is simulated with ANSYS. The research results show that the diaphragm wall, column and horizontal plate uplift and sink alternately under the influence of foundation rebound, gravity and construction load. Under the influence of lateral soil pressure and horizontal plate, the horizontal deformation curves of the diaphragm wall is similar to bow at first and then to s shape. The huge horizontal stiffness of the plate can control the horizontal deformation of the diaphragm wall effectively. The most disadvantageous positions of internal force in each condition are shown finally, and the results can be referenced by similar engineering.
引用
收藏
页码:3757 / +
页数:2
相关论文
共 50 条
  • [1] Numerical Simulation on Top-down Construction Method of Subway Station in Hefei
    Ding, Kewei
    Guo, Naiyang
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON LOGISTICS, ENGINEERING, MANAGEMENT AND COMPUTER SCIENCE (LEMCS 2015), 2015, 117 : 1731 - 1734
  • [2] Performance of diaphragm wall constructed using top-down method
    Ou, CY
    Liao, JT
    Lin, HD
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 1998, 124 (09) : 798 - 808
  • [3] A New Subway Station Construction Method: Top-down Boring with Cast-in-situ Arch
    Huang, Meiqun
    Ding, Deyun
    Yang, Xiuren
    Wang, Chen
    ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 1706 - 1710
  • [4] Performance of diaphragm wall constructed using top-down method - Discussion
    Lings, ML
    Nash, DFT
    Hsiung, BCB
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 1999, 125 (12) : 1100 - 1101
  • [5] Measured structural response of a long irregular pit constructed using a top-down method
    Sun, Yang
    Che, Yufei
    Gu, Zhenxue
    Wang, Ruicai
    Fan, Yawen
    GEOMECHANICS AND ENGINEERING, 2022, 31 (05) : 489 - 503
  • [6] Numerical simulation of evacuation in a subway station
    Li, Zhen-yu
    Tang, Minbo
    Liang, Dong
    Zhao, Zhe
    2015 INTERNATIONAL CONFERENCE ON PERFORMANCE-BASED FIRE AND FIRE PROTECTION ENGINEERING (ICPFFPE 2015), 2016, 135 : 616 - 621
  • [7] Numerical Analysis on Deformation of Braced Excavation with Top-down Method
    Ding, Y. C.
    Wang, D. G.
    Liu, J. C.
    Gu, K. H.
    Cheng, Z. K.
    Wang, J. H.
    NEW FRONTIERS IN ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2013, : 61 - 64
  • [8] TOP-DOWN (DYNAMICAL) METHOD
    陆维明
    ScienceinChina,SerA., 1982, Ser.A.1982 (03) : 302 - 309
  • [9] TOP-DOWN (DYNAMICAL) METHOD
    陆维明
    Science China Mathematics, 1982, (03) : 302 - 309
  • [10] TOP-DOWN (DYNAMICAL) METHOD
    LU, WM
    SCIENTIA SINICA SERIES A-MATHEMATICAL PHYSICAL ASTRONOMICAL & TECHNICAL SCIENCES, 1982, 25 (03): : 302 - 309