Optimal procurement contracts under a binding budget constraint

被引:19
|
作者
Levaggi, R [1 ]
机构
[1] Univ Genoa, Fac Econ, Ist Finanza, Genoa, Italy
关键词
Public Finance; Optimal Procurement; Government Agency; Budget Constraint; Agency Model;
D O I
10.1023/A:1018311920072
中图分类号
F [经济];
学科分类号
02 ;
摘要
The traditional literature on agency models predicts that, for zero liability contracts, it is optimal for the principal to pay for the information he cannot observe. However, this principle is not valid for a set of contracts mostly used by government agencies whose distinguishing feature is represented by a stringent budget constraint for the principal. This paper shows that in this environment the principal will either choose a structure exibiting pooling or a bargaining solution. The bargaining solution represents the analytical proof to the intuition of the difficulty in implementing procurement contracts stated by Laffont and Tirole (1993).
引用
收藏
页码:23 / 37
页数:15
相关论文
共 50 条
  • [1] Optimal procurement contracts under a binding budget constraint
    Rosella Levaggi
    [J]. Public Choice, 1999, 101 : 23 - 37
  • [2] Optimal Food Safety Sampling Under a Budget Constraint
    Powell, Mark R.
    [J]. RISK ANALYSIS, 2014, 34 (01) : 93 - 100
  • [3] Optimal measurement allocation under precision budget constraint
    Belitser, Eduard
    [J]. STATISTICS & PROBABILITY LETTERS, 2016, 117 : 46 - 53
  • [4] Optimal Allocation of Research Funds under a Budget Constraint
    Fairley, Michael
    Cipriano, Lauren E.
    Goldhaber-Fiebert, Jeremy D.
    [J]. MEDICAL DECISION MAKING, 2020, 40 (06) : 797 - 814
  • [5] OPTIMAL PREVENTIVE MAINTENANCE POLICY UNDER A BUDGET CONSTRAINT
    Singh, Inderjeet
    Popova, Elmira
    Kee, Ernie
    [J]. ICONE16: PROCEEDING OF THE 16TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2008, VOL 1, 2008, : 13 - 18
  • [6] A dynamic auction for multi-object procurement under a hard budget constraint
    Ensthaler, Ludwig
    Giebe, Thomas
    [J]. RESEARCH POLICY, 2014, 43 (01) : 179 - 189
  • [7] Dynamic Procurement under Uncertainty: Optimal Design and Implications for Incomplete Contracts
    Arve, Malin
    Martimort, David
    [J]. AMERICAN ECONOMIC REVIEW, 2016, 106 (11): : 3238 - 3274
  • [8] Optimal procurement contracts for electricity generation
    Blair, BF
    [J]. JOURNAL OF ENVIRONMENTAL ECONOMICS AND MANAGEMENT, 1997, 32 (01) : 125 - 138
  • [9] Optimal monitoring in dynamic procurement contracts
    Asseyer, Andreas
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ORGANIZATION, 2018, 59 : 222 - 252
  • [10] Optimal asset allocation for participating contracts under the VaR and PI constraint
    Dong, Yinghui
    Wu, Sang
    Lv, Wenxin
    Wang, Guojing
    [J]. SCANDINAVIAN ACTUARIAL JOURNAL, 2020, 2020 (02) : 84 - 109