Lessons Learned in the Planning, Design, and Construction of the Carlsbad Desalination Conveyance Pipeline

被引:0
|
作者
Bush, Mark W. [1 ]
Tedesco, Steve [1 ]
机构
[1] Tetra Tech, Water Waste, 17885 Karman Ave,Suite 500, Irvine, CA 92614 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
San Diego County Water Authority (SDCWA), like most of California, is in desperate need for new reliable water supplies. In 2012, SDCWA signed a long-term purchase agreement for water from the Carlsbad Seawater Desalination Plant (Desalination Plant). The 54 million gallon per day (MGD) Desalination Plant is the largest desalination plant in the Western Hemisphere. In order to move this new 54 MGD supply into the SDCWA system the Carlsbad Desalination Conveyance Pipeline (Conveyance Pipeline) and several other improvements to the agency's system were required. This paper provides details on how SDCWA worked with the private developer, Poseidon Water and the design-builder, Kiewit Shea Desalination Joint Venture to build a new 10 mile, 54-inch pipeline, at a cost of $150 million, that would convey water from a new water supply source, the Pacific Ocean. A complex water purchase agreement and design-build/engineering procurement contract were used to construct the Desalination Plant. The Conveyance Pipeline was required to be designed to SDCWA standards and meet all regulatory requirements. The authors from the engineer of record for the project have provided their opinions on both the project successes and the lessons learned on the project. Most importantly the authors described how all parties worked together to deliver this very important regional project.
引用
收藏
页码:758 / 767
页数:10
相关论文
共 50 条
  • [1] Desalination planning: Green desalination in Carlsbad, USA
    Voutchkov, Nikolay
    [J]. FILTRATION + SEPARATION, 2008, : 6 - +
  • [2] US Gulf of Mexico deepwater pipeline construction - A review of lessons learned
    Kaiser, Mark J.
    [J]. MARINE POLICY, 2017, 86 : 214 - 233
  • [3] ON PIPELINE LATERAL BUCKLING: LESSONS LEARNED AND CURRENT DESIGN CHALLENGES
    Maschner, Emil A.
    Abdalla, Basel
    [J]. PROCEEDINGS OF THE ASME 31ST INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARTIC ENGINEERING, VOL 3, 2012, : 331 - 341
  • [4] Improving the Pipeline: Lessons Learned
    Gorka, Sandra
    McNett, Alicia
    Miller, Jacob R.
    Webb, Bradley M.
    [J]. SIGITE'18: PROCEEDINGS OF THE 19TH ANNUAL SIG CONFERENCE ON INFORMATION TECHNOLOGY EDUCATION, 2018, : 59 - 59
  • [5] Lessons Learned from Construction Site Layout Planning Practices
    Hansen, Seng
    [J]. INGENIERIA E INVESTIGACION, 2024, 44 (01):
  • [6] The Conveyance of Ideas to Facilitate Pipeline Design and Delivery
    Alcock, Matthew
    Guercio, Noel
    [J]. PIPELINES 2019: PLANNING AND DESIGN, 2019, : 267 - 275
  • [7] Lessons Learned - Swedish Design and Construction of Industrial Concrete Floors
    Hedebratt, Jerry
    Silfwerbrand, Johan
    [J]. NORDIC CONCRETE RESEARCH, 2012, 45 (01): : 75 - 92
  • [8] Refactoring Planning for Design Smell Correction: Summary, Opportunities and Lessons Learned
    Perez, Javier
    [J]. 2013 29TH IEEE INTERNATIONAL CONFERENCE ON SOFTWARE MAINTENANCE (ICSM), 2013, : 572 - 577
  • [9] A lessons-learned mobile system for construction companies: motivation and design
    Ferrada, Ximena
    Sepulveda, Marcos
    Serpell, Alfredo
    Nunez, Daniela
    Neyem, Andres
    [J]. CREATIVE CONSTRUCTION CONFERENCE 2014, 2014, 85 : 157 - 165
  • [10] GEOTECHNICAL LESSONS LEARNED FROM NINETEEN RAILWAY TRENCHLESS CROSSINGS DURING CONSTRUCTION OF A TRANSMISSION PIPELINE
    Park, Jack
    Wheeler, Lisa
    Johnston, Katherine
    Statters, Mike
    [J]. PROCEEDINGS OF THE ASME 2020 13TH INTERNATIONAL PIPELINE CONFERENCE (IPC2020), VOL 2, 2020,