摘要
An effective short-term scheduling formulation must simultaneously deal with several problem difficulties commonly arising in batch processes operations. One of the key features to be considered is the representation of the material transfer operations between process stages. A nonzero time as well as certain conditions and resources are always required to move the material from one processing stage to the next one according to the specified product recipe. The transfer task consumes a period of time during which a proper synchronization of the equipment units supplying and receiving the material is enforced. Synchronization implies that during the execution of the transfer task, one unit will be supplying the material whereas the other one will be receiving it and consequently, no other task can be simultaneously performed in both units. Most of the existing mixed-integer linear programming (MILP) optimization approaches have traditionally dealt with the batch scheduling problem assuming zero transfer times, and consequently no synchronization, between consecutive processing stages. Simplification relying on negligible transfer times may work properly for the scheduling of multiproduct batch plants with similar product recipes; however, it is demonstrated in this work that ignoring the important role of transfer times may seriously compromise the feasibility of the scheduling whenever shared units and storage tanks, material recycles, or bidirectional flows of products are to be considered. To overcome the serious limitations of current MILP-based scheduling approaches, a general precedence-based framework accounting for nonzero transfer times is introduced. Also, two alternative methods that avoid generating unfeasible schedules are proposed and tested in different case studies.
引用
收藏
页码:7721 / 7732
页数:12
相关论文
共 50 条
  • [1] Airline operations and scheduling.
    Lev, Benjamin
    INTERFACES, 2006, 36 (04) : 371 - 372
  • [2] FUNDAMENTALS OF CRITICAL PATH PLANNING AND SCHEDULING.
    Stumpo Jr., Anthony R.
    Cost Engineering (Morgantown, West Virginia), 1986, 28 (10): : 20 - 24
  • [3] Three dimensional Bin Packing Problem in batch scheduling.
    Koblasa, Frantisek
    Vavrousek, Miroslav
    Manlig, Frantisek
    34TH INTERNATIONAL CONFERENCE MATHEMATICAL METHODS IN ECONOMICS (MME 2016), 2016, : 407 - 412
  • [4] Standards for Continual Scheduling of Batch Operations
    Siletti, Charles
    Petrides, Demetri
    Vardalis, Dimitri
    21ST EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2011, 29 : 970 - 974
  • [5] AUTOMATIC SCHEDULING OF BATCH-OPERATIONS
    HOGENSON, DC
    INTECH, 1990, 37 (04) : 30 - 32
  • [6] Standards for Continual Scheduling of Batch Operations
    Siletti, Charles
    Petrides, Demetri
    Vardalis, Dimitri
    21ST EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2011, 29 : 1361 - 1365
  • [7] MODELING OF BLENDING/TRANSLOADING FACILITIES FOR USE IN OPTIMAL FUEL SCHEDULING.
    Newdome, Thomas P.
    Gibson, Charles A.
    IEEE transactions on power apparatus and systems, 1985, PAS-104 (11): : 3050 - 3055
  • [8] AUTOMATIC SCHEDULING OF A NETWORK OF BATCH-OPERATIONS
    HOGENSON, DC
    ADVANCES IN INSTRUMENTATION AND CONTROL, VOL 44, PT 1-4, 1989, 44 : 207 - 211
  • [9] Overview of planning and scheduling of batch process operations
    Giritligil, S
    Cesur, S
    Kuryel, B
    DYNAMICS & CONTROL OF PROCESS SYSTEMS 1998, VOLUMES 1 AND 2, 1999, : 455 - 460
  • [10] Operations and shipment scheduling of a batch on a flexible machine
    Iravani, SMR
    Buzacott, JA
    OPERATIONS RESEARCH, 2003, 51 (04) : 585 - 601