Performance and Management of Cost in the Construction Industry

被引:3
|
作者
Shaikh, Fazal Ali [1 ]
Odhano, Nasurullah [1 ]
Kaliannan, Suaathi [2 ]
机构
[1] Univ Sindh, Allama II Kazi Campus, Jamshoro 76080, Sindh, Pakistan
[2] Univ Tun Hussein Onn Malaysia, Parit Raja 86400, Johor, Malaysia
来源
CIVIL ENGINEERING JOURNAL-TEHRAN | 2020年 / 6卷 / 07期
关键词
Construction Sector; Cost Analysis; Pakistan; Stakeholders; PROJECTS; OVERRUNS; DELAY;
D O I
10.28991/cej-2020-03091554
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the arena of cost baselines and project budgets, the construction industry is always famed and controversial. Owing to the paucity of funds or maladministration at various levels, there is 90 percent of project delay is fully stranded. While being a major contributor to a country's Gross Domestic Product, its sufficient potentiality has never been tapped. Maybe this dismaying climate is created by the cold-hearted, reckless and unscrupulous attitudes of construction industry stakeholders. The main objectives of this research is to determine the genesis of exceeded budget/cost in construction projects that affect cost management and to suggest appropriate measures to harness the construction industry's full potential. The key drivers that have positive or negative repercussions on the cost aspect of the projects are the administration, pundits and consumers or holders. For assessing the most common causative factors of exceeded cost in construction projects, the authors organized interactive discussions with construction industry pundits, designers, architects, schematic experts, and manufacturers. Moreover, the incumbent concerns in the construction industry were analyzed and examined to examine important factors. To underscore the key motives that drive the projects, directly and indirectly, a questionnaire was dispensed between the participants on the analysis in the cost of undergoing projects. Results of the study are the key interpretations which were drawn from this research paper are fraud, weak political engrossment, poor site management, hampering of site deployment, consultants inflexible approach, gold plating, faulty safety and healthcare management system. To remove these hurdles, I have recommended appropriate guidelines for preventing, reducing or mitigating the effects of these factors.
引用
收藏
页码:1368 / 1374
页数:7
相关论文
共 50 条
  • [1] CALCULATION METHODS FOR COST MANAGEMENT IN THE CONSTRUCTION INDUSTRY
    Bozgulova, Nazym
    Parmanova, Rimma
    Abenova, Maira
    Ivanyuk, Tatyana
    Aryshev, Vassiliy
    [J]. ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES, 2019, 7 (02): : 1450 - 1461
  • [2] Improving cost management in the construction industry: a methodological aspect
    Gerasimova, Larisa
    [J]. AMAZONIA INVESTIGA, 2020, 9 (25): : 213 - 222
  • [3] An appraisal of cost management techniques used in the construction industry
    Tembo, C. K.
    Muleya, F.
    Kanyemba, A.
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (01) : 10 - 18
  • [4] Innovationsin cost and performance management in manufacturing industry
    Qiao, ZL
    Chen, L
    [J]. ISMOT'04: PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON MANAGEMENT OF INNOVATION AND TECHNOLOGY: MANAGING TOTAL INNOVATION IN THE 21ST CENTURY, 2004, : 269 - 272
  • [5] The Nexus of Management Innovation, Performance Management, and Organizational Performance in the Pakistani Construction Industry
    Aftab, Junaid
    Sarwar, Huma
    Abid, Nabila
    Ishaq, Muhammad Ishtiaq
    Kiran, Alina
    Aftab, Fahad
    [J]. CENTRAL EUROPEAN MANAGEMENT JOURNAL, 2022, 30 (04) : 2 - 26
  • [6] A project management quality cost information system for the construction industry
    Love, PED
    Irani, Z
    [J]. INFORMATION & MANAGEMENT, 2003, 40 (07) : 649 - 661
  • [7] Measuring Project Management Performance: Case of Construction Industry
    Demirkesen, Sevilay
    Ozorhon, Beliz
    [J]. ENGINEERING MANAGEMENT JOURNAL, 2017, 29 (04) : 258 - 277
  • [8] Effect of knowledge management on growth performance in construction industry
    Abu Bakar, Abu Hassan
    Yusof, Mohamad Nizam
    Tufail, Muhammad Asim
    Virgiyanti, Wiwied
    [J]. MANAGEMENT DECISION, 2016, 54 (03) : 735 - 749
  • [9] EFFECT OF DESIGN MANAGEMENT ON COST PERFORMANCE OF CONSTRUCTION PROJECTS
    Anita
    Doloi, Hemanta
    [J]. IMPLEMENTING INNOVATIVE IDEAS IN STRUCTURAL ENGINEERING AND PROJECT MANAGEMENT, 2015, : 1347 - 1352
  • [10] Relationship between Time Management in Construction Industry and Project Management Performance
    Nasir, Najuwa
    Nawi, Mohd Nasrun Mohd
    Radzuan, Kamaruddin
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON APPLIED SCIENCE AND TECHNOLOGY 2016 (ICAST '16), 2016, 1761