Software for improving the quality of project management, a case study: international manufacture of electrical equipment

被引:0
|
作者
Preradovic, D. M. [1 ]
Micic, Lj S. [1 ]
Barz, C. [2 ]
机构
[1] Univ Banja Luka, Fac Econ, Ul Majke Jugovica 4, Banja Luka 78000, Bosnia & Herceg
[2] Tech Univ Cluj Napoca, North Univ Ctr Baia Mare, Victor Babes Str 62A, Baia Mare 430083, Romania
来源
关键词
D O I
10.1088/1757-899X/200/1/012044
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Production conditions in today's world require software support at every stage of production and development of new products, for quality assurance and compliance with ISO standards. In addition to ISO standards such as usual metrics of quality, companies today are focused on other optional standards, such as CMMI (Capability Maturity Model Integrated) or prescribing they own standards. However, while there is intensive progress being made in the PM (project management), there is still a significant number of projects, at the global level, that are failures. These have failed to achieve their goals, within budget or timeframe. This paper focuses on checking the role of software tools through the rate of success in projects implemented in the case of internationally manufactured electrical equipment. The results of this research show the level of contribution of the project management software used to manage and develop new products to improve PM processes and PM functions, and how selection of the software tools affects the quality of PM processes and successfully completed projects.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Improving the quality of information for software project management
    Berry, Michael
    Johnson, Chris S.
    [J]. SOFTWARE PROCESS AND PRODUCT MEASUREMENT, 2008, 4895 : 1 - 20
  • [2] ELECTRICAL EQUIPMENT MODERNIZATION PROJECT - A CASE STUDY
    Wester, Craig
    Hall, Patrick
    Levine, John
    Smith, Terrence
    Chambers, Andrew
    [J]. 2015 IEEE PETROLEUM AND CHEMICAL INDUSTRY COMMITTEE CONFERENCE (PCIC), 2015,
  • [3] QUALITY MANAGEMENT IN PROJECT MANAGEMENT CONSULTING. A CASE STUDY IN AN INTERNATIONAL CONSULTING COMPANY
    Ceptureanu, Eduard-Gabriel
    Ceptureanu, Sebastian-Ion
    Luchian, Cristian-Eugen
    Luchian, Iuliana
    [J]. AMFITEATRU ECONOMIC, 2017, 19 (44) : 215 - 230
  • [4] Global Software Project Management: A Case Study
    Bjorndal, Petra
    Smiley, Karen
    Mohapatra, Prateeti
    [J]. SOFTWARE ENGINEERING APPROACHES FOR OFFSHORE AND OUTSOURCED DEVELOPMENT, 2010, 54 : 64 - +
  • [5] IMPROVING SOFTWARE PROJECT-MANAGEMENT
    PULK, BE
    [J]. JOURNAL OF SYSTEMS AND SOFTWARE, 1990, 13 (03) : 231 - 235
  • [6] Improving software project management skills using a software project simulator
    Merrill, D
    Collofello, JS
    [J]. FRONTIERS IN EDUCATION 1997 - 27TH ANNUAL CONFERENCE, PROCEEDINGS, BOLS I - III, 1997, : 1361 - 1366
  • [7] Improving the software problem management process:: A case study
    Jantti, Marko
    Kinnunen, Kari
    [J]. SOFTWARE PROCESS IMPROVEMENT, PROCEEDINGS, 2006, 4257 : 40 - 49
  • [8] Improving project success: A case study using benefits and project management
    Gomes, Jorge
    Romao, Mario
    [J]. INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, CENTERIS/PROJMAN / HCIST 2016, 2016, 100 : 489 - 497
  • [9] Improving software development management through software project telemetry
    Johnson, PM
    Kou, HB
    Paulding, M
    Zhang, Q
    Kagawa, A
    Yamashita, T
    [J]. IEEE SOFTWARE, 2005, 22 (04) : 76 - +
  • [10] Software Project Metrics and Quality Management
    Huang, Futong
    Sun, Tingting
    [J]. 2013 NINTH INTERNATIONAL CONFERENCE ON INTELLIGENT INFORMATION HIDING AND MULTIMEDIA SIGNAL PROCESSING (IIH-MSP 2013), 2013, : 615 - 618