Long-term stability of large span caverns at the 1400-year Heidong quarry

被引:8
|
作者
Yang, Zhifa [1 ]
Shang, Yanjun [1 ]
Li, Lihui [1 ]
Zhang, Luqing [1 ]
Zhang, Zhongjian [1 ]
Li, Tianbin [2 ]
Zhang, Wei [1 ]
Xu, Shangshu [3 ]
机构
[1] Chinese Acad Sci, Inst Geol & Geophys, Beijing 100029, Peoples R China
[2] Chengdu Univ Technol, State Key Lab Geohazard Prevent & Geoenvironm Pro, Chengdu 610059, Peoples R China
[3] Res Comm Tiantai Mt, Tiantai 317200, Peoples R China
来源
EPISODES | 2013年 / 36卷 / 01期
基金
中国国家自然科学基金;
关键词
BET-GUVRIN; ROCK;
D O I
10.18814/epiiugs/2013/v36i1/006
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
Long-term stability of large span caverns is earnest but poorly understood in preservation of cultural relics. The life span of huge caverns is difficult to extrapolate from short period of monitoring or laboratory testing. A huge ancient quarry with 21 caverns whose original status is well kept over 1400 years was found in Tiantai County of South China. One of the caverns has an 81 m span which is far beyond the 50 m expectation on current knowledge. The tension at the core of long stability is the excavation speed versus deliberation. Here we show a unique technique of Digging Holes for Quarrying Vertical Flagstone (DQF) invented by ancestors to ensure the safety, which is much smarter compared to blasting and casting technique that commonly used after the Industrial Revolution. Furthermore, in addition to selecting competent massive rocks via cutting normally to and through faults, they adopted systematically trial adits, dome-shaped cavern, and disposal of waste rocks inside caverns for support. These ancient achievements mark a high level of quarrying in complex natural conditions with manpower. The results are positive to extend our knowledge in category design of cavern scale and stability assessment, and to some extent, they give solutions to the conflict between fast excavation with blasting and induced excavation damaged zone (EDZ) in surrounding rocks.
引用
收藏
页码:39 / 46
页数:8
相关论文
共 50 条
  • [1] Surrounding Rock Failure Mechanism and Long-Term Stability of the Heidong Large Ancient Underground Caverns
    Gao, Bingli
    Yang, Congcong
    Li, Lang
    Zhang, Haixiang
    He, Wantong
    Yang, Zhifa
    Cai, Zhiyun
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2022, 40 (10) : 4975 - 4990
  • [2] Surrounding Rock Failure Mechanism and Long-Term Stability of the Heidong Large Ancient Underground Caverns
    Bingli Gao
    Congcong Yang
    Lang Li
    Haixiang Zhang
    Wantong He
    Zhifa Yang
    Zhiyun Cai
    Geotechnical and Geological Engineering, 2022, 40 : 4975 - 4990
  • [3] Stability analysis of Cavern No. 5 with the largest span in Heidong large ancient underground quarry
    Bingli Gao
    Haixiang Zhang
    Wantong He
    Zhifa Yang
    Zhiyun Cai
    Qun Zhang
    Environmental Earth Sciences, 2020, 79
  • [4] Stability analysis of Cavern No. 5 with the largest span in Heidong large ancient underground quarry
    Gao, Bingli
    Zhang, Haixiang
    He, Wantong
    Yang, Zhifa
    Cai, Zhiyun
    Zhang, Qun
    ENVIRONMENTAL EARTH SCIENCES, 2020, 79 (11)
  • [5] The long-term thermal stability of thermo-span alloy
    R. B. Frank
    JOM, 2000, 52 (1) : 37 - 39
  • [6] The long-term thermal stability of thermo-span alloy
    Frank, RB
    JOM-JOURNAL OF THE MINERALS METALS & MATERIALS SOCIETY, 2000, 52 (01): : 37 - 39
  • [7] LONG-TERM BEHAVIOR OF BURIED LARGE-SPAN CULVERTS
    MCVAY, M
    PAPADOPOULOS, P
    JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1986, 112 (04): : 424 - 442
  • [8] Investigation on the Long-Term Stability of Multiple Salt Caverns Underground Gas Storage With Interlayers
    Peng, Jinghong
    Zhou, Jun
    Liang, Guangchuan
    Peng, Cao
    Hu, Chengqgiang
    Guo, Dingfei
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 2023, 145 (08):
  • [9] Long-term memory span
    Nairne, JS
    Neath, I
    BEHAVIORAL AND BRAIN SCIENCES, 2001, 24 (01) : 134 - +
  • [10] LONG-TERM BEHAVIOR OF BURIED LARGE-SPAN CULVERTS - DISCUSSION
    JOSEPH, TP
    JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1988, 114 (03): : 376 - 378