The Research of Risk Warning Mechanism for Metro Construction Based on GIS

被引:0
|
作者
Liu, Ge [1 ]
Cui, Huabing [1 ]
机构
[1] Tianjin Inst Urban Construct, Tianjin 300384, Peoples R China
关键词
GIS; metro construction; warning mechanism;
D O I
10.1016/j.proeng.2012.01.068
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Because the professional, industry, units and equipment are complex in metro construction, the risk management is more and more important in the process of metro construction. The traditional methods of construction safety control can not meet the construction of metro project. To ensure the safety of metro construction and reduce accidents in the process of metro construction, the current situation and problems we faced in metro safety risk management should be studied first. And then the metro project risk warning mechanism based on the GIS is constructed according to the problems we faced, to achieve visual monitoring and warning of metro construction safety risk management and to provide decision support for metro construction. (C) 2011 Published by Elsevier Ltd. Selection and/or peer-review under responsibility of Harbin University of Science and Technology.
引用
收藏
页码:940 / 946
页数:7
相关论文
共 50 条
  • [1] Research on detection and early warning of unsafe behavior in metro construction based on video monitoring
    Xie Y.
    Zhang J.
    Li T.
    Liu J.
    Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2019, 47 (10): : 46 - 51
  • [2] Development of web-based system for safety risk early warning in urban metro construction
    Ding, L. Y.
    Zhou, C.
    AUTOMATION IN CONSTRUCTION, 2013, 34 : 45 - 55
  • [3] Research on the construction of early warning mechanism of college students
    Chen, Baopeng
    BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2019, 125 : 135 - 136
  • [4] Safety Risk Early-Warning for Metro Construction Based on Factor Analysis and BP_Adaboost Network
    Wang, Hong-De
    Ma, Bai-Le
    Zhang, Yan-Chao
    FUZZY SYSTEMS AND DATA MINING II, 2016, 293 : 341 - 346
  • [5] Research on the Construction of Financial Risk Early Warning Model Based on Association Rule Algorithm
    Zhu, Ping
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON ALGORITHMS, SOFTWARE ENGINEERING, AND NETWORK SECURITY, ASENS 2024, 2024, : 422 - 427
  • [6] Research on the Early-warning for Construction Project Cost Risk
    Liu Zi-mei
    Xie Ke-fan
    2013 FOURTH INTERNATIONAL CONFERENCE ON DIGITAL MANUFACTURING AND AUTOMATION (ICDMA), 2013, : 1127 - 1129
  • [7] Research on the risk early warning model construction of the enterprise group
    Xu, Dayong
    Journal of Applied Sciences, 2013, 13 (21) : 4489 - 4494
  • [9] Research on construction emulation system based on GIS
    Li, LB
    Tian, H
    Proceedings of 2005 International Conference on Construction & Real Estate Management, Vols 1 and 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 547 - 550
  • [10] Process and Modeling of Unsafe Behaviors Early Warning in Metro Construction
    XIE Yi
    LIU Bingrui
    BAI Jinyu
    LIU Jia
    Wuhan University Journal of Natural Sciences, 2020, 25 (01) : 12 - 18