Establishing the project portfolio management in the construction company

被引:0
|
作者
Bizon-Gorecka, Jadwiga [1 ]
Gorecki, Jaroslaw [2 ]
机构
[1] Univ Bydgoszcz, Unii Lubelskiej 4C, PL-85059 Bydgoszcz, Poland
[2] UTP Univ Sci & Technol Bydgoszcz, Al Prof S Kaliskiego 7, PL-85796 Bydgoszcz, Poland
关键词
D O I
10.1088/1757-899X/603/5/052014
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The principal production activity of construction companies is centralised on the investment and construction projects executed on various construction sites. In the pursuit of using the potential accumulated in the means of production, construction companies start to manage a number of projects implemented concurrently. Therefore, a project portfolio is a key challenge for the strategic management of modern construction companies. There is a way to deal with the multi-project phenomenon called the project portfolio management. At this level, specific features of construction production have to be taken into account. An efficient selection of the project portfolio, treated as the project portfolio management maturity, allows reducing the risk associated with investing in projects, by creating a combination of expenses on a number of projects. The strategies accepted by an organisation determine the project portfolio to the implementation according to some specific requirements (scope, deadlines, cost, quality). Disruptions of meeting these requirements generate the risk associated with concrete projects, and the configuration of the project portfolio, i.e. a number of projects implemented parallelly, their distribution in time and space, produces the risk connected with resources vital to the project execution. Results of a survey conducted among 100 Polish construction entrepreneurs, regarding the problems of establishing the project portfolio management, were presented. Majority of respondents indicated a profit margin as the most important factor in the selection of the project. A number of projects executed in one year, in individual groups of the surveyed enterprises, varies. Large companies usually execute up to 5 projects at the same time. In turn, small and micro-sized enterprises are mostly involved in 620 projects in one year. The research revealed that the most frequently indicated criterion for selecting the project portfolio in the construction industry is the availability of workforce. Subsequently, the availability of materials and equipment were indicated in the second and third place. All factors of production, i.e. human resources, materials, equipment as well as financial resources, become sources of the risk in projects, as it comes to a chance to obtain or substitute them. The summary includes a conclusion of the considerations, containing a specification of criteria for selecting the project portfolio in a construction company.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] Strategy based project portfolio design and management in company
    Zhai Lei
    Qi Anbang
    Chai Lijun
    [J]. Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 713 - 717
  • [2] Energy Project Portfolio Management System Construction
    Wu Yunna
    Wang Jiali
    Li Jiangshuai
    [J]. MECHATRONICS AND INTELLIGENT MATERIALS, PTS 1 AND 2, 2011, 211-212 : 72 - 77
  • [3] Integrating sustainability into construction project portfolio management
    Siew, Renard Yung Jhien
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (01) : 101 - 108
  • [4] Integrating sustainability into construction project portfolio management
    Renard Yung Jhien Siew
    [J]. KSCE Journal of Civil Engineering, 2016, 20 : 101 - 108
  • [5] Improvement of Project Portfolio Management in an Information Technology Consulting Company
    Kaewta, Sirirat
    Chutima, Parames
    [J]. ADVANCED SCIENCE LETTERS, 2014, 20 (10-12) : 2264 - 2267
  • [6] Improvement of Project Portfolio Management in an Information Technology Consulting Company
    Kaewta, S.
    Chutima, P.
    [J]. 2014 INTERNATIONAL CONFERENCE ON MANUFACTURING, OPTIMIZATION, INDUSTRIAL AND MATERIAL ENGINEERING (MOIME 2014), 2014, 58
  • [7] Project portfolio management in a company strategy implementation, a case study
    Hyvari, Irja
    [J]. SELECTED PAPERS FROM THE 27TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), 2014, 119 : 229 - 236
  • [8] Study on Construction Enterprises Project Portfolio Management Mode
    Li, Na
    Luo, Qian
    [J]. INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6, 2011, : 1270 - 1273
  • [9] STUDY OF EVALUATION FACTORS FOR THE PROJECT PORTFOLIO MANAGEMENT IN A COMPANY OF CONSUMER GOODS
    Navarro, Dorizon Alberto
    [J]. REVISTA DE GESTAO E PROJETOS, 2012, 3 (03): : 291 - 306
  • [10] Project portfolio management in telecommunication company: A stage-gate approach for effective portfolio governance
    Milenkovic, M.
    Lalic, Ciric D.
    Vujicic, M.
    Pesko, I
    Savkovic, M.
    Gracanin, D.
    [J]. ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2023, 18 (03): : 357 - 370