The Analytical Model and Path of the Group Conflict Events from Project Management Perspective

被引:0
|
作者
Guo, Peng [1 ]
Jia, Ying-ying [1 ]
Wang, Min [1 ]
机构
[1] Northwestern Polytech Univ, Sch Management, Xian 710072, Shanxi, Peoples R China
关键词
Group conflict events; Project management; Factor; Life-cycle; Stakeholders;
D O I
暂无
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Based on the Value-added theory, the paper analyzes the factors that lead to the group conflict events. On that basis, from the project management view, using the project life-cycle theory and the project stakeholder theory, analyzes the life-cycle and stakeholders of the group conflict events. Then, the paper combines the three essentials, and builds the three-dimensional model used for analyzing the group conflict events, concludes the analyzing route of the group conflict events, with the a specific case explains how to use the analyzing path.
引用
收藏
页码:56 / 60
页数:5
相关论文
共 6 条
  • [1] Jia Shenghua, 2005, FOREIGN EC MANAGEMEN, V5, P14
  • [2] Toward a theory of stakeholder identification and salience: Defining the principle of who and what really counts
    Mitchell, RK
    Agle, BR
    Wood, DJ
    [J]. ACADEMY OF MANAGEMENT REVIEW, 1997, 22 (04): : 853 - 886
  • [3] Smelser N.J., 1963, COLLECTIVE BEHAV, P168
  • [4] Wang Yong, 2009, GUID PROJ MAN BOD KN
  • [5] Xiong Jian, 2009, J BEIJING U AERONAUT, V21, P26
  • [6] Zhang Shenwei, 2009, LEADING EDGE, V10, P163