Fuzzy time semirings and fuzzy-timing colored Petri nets

被引:0
|
作者
Wu, FM [1 ]
机构
[1] Univ Haifa, Dept Math & Comp Sci, IL-31905 Haifa, Israel
关键词
D O I
10.1002/(SICI)1098-111X(199908)14:8<747::AID-INT3>3.0.CO;2-Q
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
We define a time scale as a linear-ordered commutative monoid (LOC-monoid, for short), which generalized the continuous time scale. Using some existing operations in fuzzy: set theory, we equip our fuzzy time model with the algebraic structure of a semiring. This semiring structure provides a convenient environment in which we can set up a new semantics for some important features of a fuzzy-timing colored Petri net model (FTCPN), and discuss firing order of enabled events of this net model in a particular state. To do this, we improve Murata's FTHN model and establish the dynamic behavior of our model. (C) 1999 John Wiley Re Sons, Inc.
引用
收藏
页码:747 / 774
页数:28
相关论文
共 50 条
  • [1] Fuzzy-timing Petri nets with choice probabilities for response time analysis
    Yim, Jaegeol
    Lee, Kye-Young
    [J]. COMPUTATIONAL SCIENCE - ICCS 2007, PT 4, PROCEEDINGS, 2007, 4490 : 652 - +
  • [2] A workflow model based on fuzzy-timing Petri nets
    Pan, Y
    Tang, Y
    Tang, N
    Yu, Y
    Dao, W
    [J]. PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, VOLS 1 AND 2, 2005, : 541 - 546
  • [3] Model of project planning based on fuzzy-timing Petri nets
    Zhang, Xin-Long
    Zhu, You-Qin
    Xia, Guo-Ping
    [J]. Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2003, 25 (02):
  • [4] Model of project planning based on Fuzzy-Timing Petri Nets
    Zhang, XL
    Xia, GP
    Zhu, YQ
    [J]. PROCEEDINGS OF 2002 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS I AND II, 2002, : 151 - 155
  • [5] Simplification rules and linear temporal inference of workflow models based on Fuzzy-Timing Colored Petri Nets
    Pang, Hui
    Fang, Zongde
    [J]. PROCEEDINGS OF THE 2008 12TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, VOLS I AND II, 2008, : 677 - +
  • [6] Generalized net representation of fuzzy-timing high-level petri nets
    Gochev, V
    Kodogiannis, V
    [J]. CONCURRENT ENGINEERING: ADVANCED DESIGN, PRODUCTION AND MANAGEMENT SYSTEMS, 2003, : 1087 - 1090
  • [7] Performance analysis of assembling gear transmission mechanism by fuzzy-timing Petri nets
    Watanuki, K
    Murata, T
    Ohtaki, H
    [J]. 10TH INTERNATIONAL CONFERENCE ON COMPUTER APPLICATIONS IN INDUSTRY AND ENGINEERING, 1997, : 17 - 20
  • [8] The CSCW analysis method based on Fuzzy-Timing High-level petri Nets
    Feng, T
    Li, RH
    [J]. 2003 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-5, PROCEEDINGS, 2003, : 2547 - 2552
  • [9] Analysis and reasoning of collaborative design activities using fuzzy-timing Petri nets based on CSCW
    Huang, Guo-Yan
    [J]. PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2006, : 1967 - 1972
  • [10] A generalized net representing functioning of all fuzzy-timing high-level petri nets
    Petrounias, I
    Gochev, V
    [J]. CONCURRENT ENGINEERING: ADVANCED DESIGN, PRODUCTION AND MANAGEMENT SYSTEMS, 2003, : 1083 - 1086