Economic and Thermodynamic Analysis for Preliminary Design of Dry Steam Geothermal Power Plant (GPP) with Multifarious Gas Removal System (GRS) in Kamojang, West Java']Java, Indonesia

被引:3
|
作者
Pranadi, Aloysius Damar [1 ]
Sihana [1 ]
Suryopratomo, Kutut [1 ]
Salis, Fiki Rahmatika [1 ]
机构
[1] Univ Gadjah Mada, Fac Engn, Nucl Engn & Engn Phys Dept, Jl Grafika 2, Sleman, Yogyakarta, Indonesia
关键词
D O I
10.1088/1755-1315/42/1/012011
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Indonesia has great number of geothermal potential separated by two kind of potential, 16.13 GW for high enthalpy and 7.88 GW for low enthalpy speculative resources [4]. In the end of 2013, Ministry of Energy and Mineral Resources stated that Geothermal Power Plant (GPP) in Indonesia have been built about 1.34 GW in capacity and wanted to seriously develop geothermal potential up to 6.64 GW by 2025 [8]. Cost is one of famous obstacle in Indonesia's GPP Development. To reduce grand total cost of GPP, this paper will present the relation between thermodynamic and economic analysis in purpose to find the most economical gas removal system in GPP. By gleaning data at Kamojang Steam Field on behalf of PT Pertamina Geothermal Energy, this study will thermodynamically analyze and calculate a GPP preliminary design with software, named as Cycle Tempo 5.0. In additional, writers create motive steam calculator (based on C++ language) to enhance thermodynamic analysis for gas removal system (GRS) and adapted the results in Cycle Tempo 5.0. After thermodynamic analysis has been done, economic study will be undertaken by Net Present Value Analysis to compare the utilization cost of three different GRS and find which kind of GRS is more economical for nearly 30 years operation. For the result, Dual LRVP has higher performance than the others, spend less utilization cost and more economical for nearly 30 years operation. Moreover, the economic analysis for replacement of gas removal system shown in this paper too. In conclusion, GPP with Dual LRVP is proper to be developed in the future Geothermal Power Plant or to replace the existing GRS in some existing GPP in Indonesia.
引用
收藏
页数:17
相关论文
共 4 条
  • [1] Economic and Thermodynamic Analysis for Preliminary Design of Dry Steam Geothermal Power Plant (GPP) with Multifarious Gas Removal System (GRS) in Kamojang, West Java, Indonesia
    Pranadi, Aloysius Damar
    Sihana
    Suryopratomo, Kutut
    Salis, Fiki Rahmatika
    IOP Conference Series: Earth and Environmental Science, 2016, 42 (01):
  • [2] Preliminary analysis of dry-steam geothermal power plant by employing exergy assessment: Case study in Kamojang geothermal power plant, Indonesia
    Rudiyanto, Bayu
    Illah, IbnuAtho
    Pambudi, Nugroho Agung
    Cheng, Chin-Chi
    Adiprana, Reza
    Imran, Muhammad
    Saw, Lip Huat
    Handogo, Renanto
    CASE STUDIES IN THERMAL ENGINEERING, 2017, 10 : 292 - 301
  • [3] Thermal modeling and simulation of a single-flash geothermal power plant involving non-condensable gas: a case study of Kamojang geothermal field in Garut, West Java']Java, Indonesia
    Sufyana, Candra Mecca
    Akbar, Fiki Taufik
    Srigutomo, Wahyu
    GEOTHERMAL ENERGY, 2023, 11 (01)
  • [4] Thermal modeling and simulation of a single-flash geothermal power plant involving non-condensable gas: a case study of Kamojang geothermal field in Garut, West Java, Indonesia
    Candra Mecca Sufyana
    Fiki Taufik Akbar
    Wahyu Srigutomo
    Geothermal Energy, 11