Precast concrete double-tee connections, part 1: Tension Behavior

被引:37
|
作者
Naito, Clay [1 ]
Pao, Liling [2 ]
Peter, Wesley [3 ]
机构
[1] Lehigh Univ, Dept Civil & Environm Engn, Bethlehem, PA 18015 USA
[2] Thornton Tomasetti, Philadelphia, PA USA
[3] SK&A Consulting Struct Engineers, Washington, DC USA
来源
PCI JOURNAL | 2009年 / 54卷 / 01期
基金
美国国家科学基金会;
关键词
Chord; connection; diaphragm; double-tee; flange connection; seismic; tension response; testing; web; welded-wire reinforcement; WWR; SEISMIC DESIGN METHODOLOGY; DIAPHRAGMS;
D O I
10.15554/pcij.01012009.49.66
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper focuses on the tension response of connections compared with design expectations and the contribution they provide in flexural resistance of the diaphragm. The pretopped flange connections were found to resist a moderate tensile force over a large deformation range. Flange connections in topped-diaphragm systems provided a high initial tensile. resistance but returned to the untopped response once the topping reinforcement failed. The strengths of both chord and flange connections were overpredicted by PCI equations due to brittle modes of weld failure. Consequently, attention should be paid to field weld alignment, and simplified models were developed to more accurately estimate the deformation capacity and strength.
引用
收藏
页码:49 / 66
页数:18
相关论文
共 50 条
  • [1] Precast concrete double-tee connectors, part 2: Shear behavior
    Cao, Liling
    Naito, Clay
    PCI JOURNAL, 2009, 54 (02): : 97 - 115
  • [2] Load testing of a precast concrete double-tee flange connector
    Shaikh, AF
    Feile, EP
    PCI JOURNAL, 2004, 49 (03): : 84 - +
  • [3] Analytical method to determine the elastic in-plane behavior of pretopped, precast concrete double-tee diaphragms with discrete connections
    Zheng, Wei
    Oliva, Michael G.
    PCI JOURNAL, 2007, 52 (05): : 106 - 123
  • [4] Foam-void precast concrete double-tee members
    Jonnalagadda, Srimaruthi
    Sreedhara, Sachin
    Soltani, Mahmoodreza
    Ross, Brandon E.
    PCI JOURNAL, 2021, 66 (01): : 49 - 59
  • [5] Parametric study on precast prestressed concrete double-tee girder for rural bridges
    Dinh Hung Nguyen
    Hong Nghiep Vu
    Thac Quang Nguyen
    COMPUTERS AND CONCRETE, 2022, 29 (03): : 161 - 168
  • [6] Restraint mechanisms in precast concrete double-tee floor systems subjected to fire
    Okasha, Nader M.
    Pessiki, Stephen
    PCI JOURNAL, 2013, : 95 - 110
  • [7] Experimental study on flexural behavior of full-scale precast prestressed concrete double-tee members
    Xiong X.
    Ge Y.
    Yao G.
    Jianzhu Jiegou Xuebao/Journal of Building Structures, 2022, 43 (02): : 127 - 136and172
  • [8] PRECAST DOUBLE-TEE BEAMS OF 120 FT SPAN
    MATHER, B
    CONCRETE, 1968, 2 (11): : 463 - &
  • [9] Parametric study of deteriorating precast concrete double-tee girder bridges using computational models
    Seo, Junwon
    Kidd, Brian
    ENGINEERING STRUCTURES, 2021, 230
  • [10] Flange to flange double-tee connections subjected to vehicular loading, part 1: Numerical assessment approach
    Hendricks, Robin
    Naito, Clay
    Osborn, Andrew
    PCI JOURNAL, 2018, : 41 - 53