Optimal constrained non-renewable resource allocation in PERT networks with discrete activity times

被引:6
|
作者
Hashemin, S. S. [1 ]
Ghomi, S. M. T. Fatemi [2 ]
Modarres, M. [3 ]
机构
[1] Islamic Azad Univ, Dept Ind Engn, Ardabil Branch, Ardebil, Iran
[2] Amirkabir Univ Technol, Dept Ind Engn, Tehran, Iran
[3] Sharif Univ Technol, Dept Ind Engn, Tehran, Iran
关键词
PERT; Resource allocation; Project management; Dynamic programming; Optimization; CONTROLLING STOCHASTIC PROJECTS; SURROGATE PROBLEM METHODOLOGY; DECISION-MAKING MODEL; NET PRESENT VALUE; PRESELECTIVE STRATEGIES; CLASSIFICATION; OPTIMIZATION; MANAGEMENT; ALGORITHM; NOTATION;
D O I
10.1016/j.scient.2012.02.024
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we develop an approach to optimally allocate a limited nonrenewable resource among the activities of a project, represented by a PERT-Type Network (PTN). The project needs to be completed within some specified due date. The objective is to maximize the probability of project completion on time. The duration of each activity is an arbitrary discrete random variable and also depends on the amount of consumable resource allocated to it. On the basis of the structure of networks, they are categorized as either reducible or irreducible. For each network structure, an analytical algorithm is presented. Through some examples, the algorithms are illustrated. (C) 2012 Sharif University of Technology. Production and hosting by Elsevier B.V. All rights reserved.
引用
收藏
页码:841 / 848
页数:8
相关论文
共 50 条