共 50 条
- [3] The Contract Expert System: A Proposal for Long-Term Supplier Evaluation, Selection and Performance Monitoring [J]. IMECS 2009: INTERNATIONAL MULTI-CONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, VOLS I AND II, 2009, : 183 - 188
- [4] TANGIBLE LONG-TERM ASSET ACCOUNTING SOFTWARE SELECTION IN UKRAINE: CASE STUDY [J]. MANAGEMENT THEORY AND STUDIES FOR RURAL BUSINESS AND INFRASTRUCTURE DEVELOPMENT, 2013, 35 (02): : 194 - 207
- [6] On the problem of long-term immobilisation in Geriatrics - a case presentation [J]. ZEITSCHRIFT FUR GERONTOLOGIE UND GERIATRIE, 2010, 43 : 31 - 31
- [7] Incorporating Cost Risk in Supplier Selection for Long Term Contracts [J]. ENGINEERING ECONOMIST, 2024, : 164 - 188